Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): Z100-00-00-P044
Vendor/Entity Legal Name (if applicable): Texas Water Development Board
MWBE Contracted Goal (if applicable):
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): 0%
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to accept from the Texas Water Development Board grant funds in the amount of $13,000,000, with a required match of $15,000,000, for the Flood Infrastructure Fund - SAFER Study grant (Bond ID Z-08, Project ID Z100-00-00-P044, Countywide).
end
Background and Discussion:
The Solutions for Advancing Floodplain Evaluation and Resilience (SAFER) study is a locally led effort focused on identifying large-scale flood risk reduction projects that could be cost-shared with the Federal government and constructed in partnership with the U.S. Army Corps of Engineers (USACE). The Flood Control District is developing a Feasibility Report and Integrated Environmental Impact Statement under the authority of Section 203 of the Water Resources Development Act of 1986, as amended, and in accordance with USACE policies and procedures. Objectives of the study include reducing flood risks and economic damage to people, communities, businesses, industry and critical infrastructure, reducing risks to public safety and life loss during flood events, and strengthening the resilience of communities and the economy in the face of frequent severe flood events.
In 2025, General Graham unofficially directed the USACE to hold all Recommended Plan authorizations and associated path to construction until the design maturity of the Recommended Plan has met a 35% design threshold. This is now on the precipice of becoming required by law with the passage of the Water Resources Development Act (WRDA) 2026.
This $13,000,000 grant award from TWDB from the 2024-2025 Flood Infrastructure Fund (FIF) is not a loan, but it does require a cash match of $15,000,000, which will be pulled from Bond ID Z-08.
This grant award will provide financial and technical assistance to the Flood Control District for costs incurred by the Study from the 23rd of January 2025, as allowed under the grant. This will relinquish previously spent Bond monies, which will then be re-budgeted within the same project towards the completion of the 35% design maturity, which is expected to commence in 2027.
Expected Impact:
Supports the development of a plan that can strengthen the resilience of communities of Harris County and its economy in the face of frequent severe flood events.
Alternative Options:
The alternative would be not to accept this grant award. The Flood Control District would need to utilize a different funding source to pay for this project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H2: Evaluate the feasibility and potential impacts of substantial, large-scale flood mitigation measures to provide equitable and transformational regional benefits.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
06/26/2025 |
131. |
Grant Application |
Location: N/A
Address (if applicable):
Precinct(s): Countywide
|
Fiscal and Personnel Summary |
|
Service Name |
Choose an item. |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
3 |
|
Local Match Source - Additional Budget Request: Bonds |
$ |
$15,000,000 |
$15,000,000 |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$13,000,000 |
$13,000,000 |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/19/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Order and Grant Budget