File #: 25-1589    Version: 1 Name:
Type: Asset Management Status: Passed
File created: 3/11/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to utilize a CMAR (Construction Manager-at-Risk) delivery method for Precinct -4 Emergency Generators Installation and the Purchasing Agent be authorized to issue a Request for Qualifications (RFQ) and administer the selection of the Construction Manager based on reputation and quality. Once selected, the CMAR would assist the Architect of Record with constructability, value engineering, and cost estimates, and all phases of work under the CMAR will be publicly bid and the bidding process will be overseen by the Purchasing Agent and their office, UPIN 24104MF3MH01, Precinct 4.

Primary Department: County Engineer

Primary Department Head/Elected Official: Dr. Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Asset Management

 

Project ID (if applicable): 24104MF3MH01

Vendor/Entity Legal Name (if applicable): TBD

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to utilize a CMAR (Construction Manager-at-Risk) delivery method for Precinct -4 Emergency Generators Installation and the Purchasing Agent be authorized to issue a Request for Qualifications (RFQ) and administer the selection of the Construction Manager based on reputation and quality. Once selected, the CMAR would assist the Architect of Record with constructability, value engineering, and cost estimates, and all phases of work under the CMAR will be publicly bid and the bidding process will be overseen by the Purchasing Agent and their office, UPIN 24104MF3MH01, Precinct 4.

end

 

Background and Discussion:

 

This project will install full-facility backup generators for a minimum of 32 critical facilities (estimated at 8 facilities per precinct). It will involve design, procurement, related site electrical upgrades and infrastructure, constructing and installing equipment, and fencing to protect generators. By adding backup power sources to the facilities, Harris County will ensure continued service to the residents of Harris County during power outages and provide much-needed warming centers and disaster shelters during major events. We expect to start the project by Q4 FY24 and complete by Q1 FY27.

 

Key tasks involved in this project include the design and construction of equipment foundation structures, upgrading the related electrical systems to accommodate the generators, installing ATS and Direct Connect Equipment, setting equipment on foundation structures, making electrical tie-ins, trenching, running conduit, and running wiring, and supporting services, systems, and equipment needed for each site. When the project is complete, we expect to have systems that will ensure uninterrupted power supply to the facilities, allowing continued use of the facility in the event of a power outage. The equipment installed will provide enough electrical generation to fully operate the facilities, instantaneously upon sensing the power drop from utility suppliers. We expect to start the project by Q4 FY24 and complete the first batch of smaller facility generators completing by Q4 FY2025 with the largest generators coming online by Q4 FY2026.

 

Phase 2 will be addressed in a future investment memo. It will include additional facilities and generator installation and upgrades. The full scope of Phase 2 will be assessed by the Harris County Engineering Department (HCED) during Phase 1.

 

Expected Impact:

 

Advertisement of the CMAR will allow the County to have a General Contractor under contract to work with the county during the design phases to help manage the budget, schedule, and the help procure long-lead items that will be needed to meet the demands of the future.

 

Alternative Options:

 

The alternative would be to not use a CMAR that would aid the county with long-lead

items, constructability reviews, value engineering and cost estimating services. This would likely lengthen the

completion schedule.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/9/2021

412

Approved - Request for approval of the Final Investment Memo for the Precinct 3 Generator Procurement project for an amount of $1,478,741 and request for approval of commercial paper funding in the amount of $1,480,000.00

8/6/2024

85

Approved - Request for approval of a Final Investment Memo for Emergency Generator Installations project for an initial amount of $38,900,000, including transferring $1,478,741 in authorization from the Precinct 3 Generators project, and an initial commercial paper allocation of $1,480,000 to be transferred from the Precinct 3 Generators Project.

 

Location:

Address (if applicable): Multiple locations

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1000 - General Fund

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Truitt Rounsavall, PE, MBA, PMP, LSSBB, Assistant Director of Capital Project Facilities, Engineering Group

 

 

Attachments (if applicable):