File #: 24-6607    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/15/2024 In control: Commissioners Court
On agenda: 10/29/2024 Final action: 10/29/2024
Title: Request for approval to execute a Professional Services Agreement with BGE, Inc., for Construction Phase Services in the amount of $75,000.00, for the Sierra Ranch and Stonefield Terrace Sec 3 Subdivisions Drainage Improvements - 2018, UPIN 19101MF12E01, Precinct 1, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible.
Attachments: 1. 24-6607-Award-UPIN 19101MF12E01-CPS-Sierra Ranch-BGE-P1-v04

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 19101MF12E01

Vendor/Entity Legal Name (if applicable): BGE, Inc.

 

MWDBE Contracted Goal (if applicable): 0%

MWDBE Current Participation (if applicable): 0%

Justification for 0% MWDBE Participation Goal:  0% - Non-Divisible

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Professional Services Agreement with BGE, Inc., for Construction Phase Services in the amount of $75,000.00, for the Sierra Ranch and Stonefield Terrace Sec 3 Subdivisions Drainage Improvements - 2018, UPIN 19101MF12E01, Precinct 1, Justification for 0% MWDBE Participation Goal:  0% - Non-Divisible.

end

 

Background and Discussion:

In order to mitigate flooding issues within the Sierra Ranch and Stonefield Terrace Sec 3 subdivision, it is proposed to increase the capacity of the existing storm sewer system within the subdivision up to the outfall channel, upgrading existing inlets, providing additional inlets to take in the overland flow through the streets as well as providing additional surface detention to provide relief to the overloaded trunk sewer. The proposed improvements will reduce structural flooding in the subdivision and ponding within the roadways during 10 and 100-year storm event.

 

Expected Impact:

Construction phase services by the Engineer of Record supports construction team with technical advice and quality assurance. The fiscal impact for this project will come from the 1080 Funding for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact on project schedule or cost anticipated.

 

Alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the construction of the project.

 

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05/10/2022

22-2830

Contract Award for Professional Engineering Services

09/24/2019

1.d.2.

Authorization to Negotiate

 

Location: Sierra Ranch and Stonefield Terrace Sec 3 subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$75,000.00

$75,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$75,000.00

$75,000.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$75,000.00

$75,000.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 29, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Construction Phase Services Agreement