Title: Request for approval of a change in contract with Cracon, Inc., in connection with Sidewalk and Access Management - Ella Blvd from Richey Rd to FM 1960, adding 85 calendar days, with an addition in the amount of $77,129.24, Job No. 22/0190-1, UPIN 21208MF21401, Precinct 1, MWBE Contracted Goal: 26%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0190, UPIN 21208MF21401 

Vendor/Entity Legal Name (if applicable): Cracon, Inc.

 

MWBE Contracted Goal (if applicable): 26%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Cracon, Inc., in connection with Sidewalk and Access Management - Ella Blvd from Richey Rd to FM 1960, adding 85 calendar days, with an addition in the amount of $77,129.24, Job No. 22/0190-1, UPIN 21208MF21401, Precinct 1, MWBE Contracted Goal: 26%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

Project includes new sidewalks along Ella Boulevard from North of Richey Road to FM 1960, access management, rebuild Ella Boulevard traffic signals at Southridge and at North Forest, new traffic signal at Butterfield Road, and new bus stop landings.

 

This change in contract includes:

                     PCO-1, Additional ramps to tie in existing sidewalk, various locations adding $3,500 with 10 days.

                     PCO-2, The addition of 2 traffic signal at Butter Field adding $22,457 with 30 days.

                     PCO-3, The relocation of a conflicting existing force main along the Right-of-Way adding $51,172.24 with 45days.

 

 

Expected Impact:

Changes will allow for the project to be constructed per the plans.

 

Alternative Options:

Revise original scope of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: J: Grow the number and size of MWBEs.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): J2: Increase the strength and size of MWBE prime vendors.

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/23/2022

246 (22-4709)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$77,129.24

$77,129.24

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$77,129.24

$77,129.24

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$77,129.24

$77,129.24

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 