Legislation Details

File #: 26-1211    Version: 1 Name:
Type: Contract - Termination Status: Passed
File created: 2/11/2026 In control: Commissioners Court
On agenda: 2/26/2026 Final action: 2/26/2026
Title: Request for approval to terminate the agreement with Civitas Engineering Group Inc., (previously known as KIT Professionals Inc.) for Professional Engineering Services in connection with West Riley Fuzzel Rd- from IH 45 to 200-ft West of West Hardy Rd- 2019, Precinct 3.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom Ramsey PE

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Termination

 

Project ID (if applicable): 20104MF1BY01

Vendor/Entity Legal Name (if applicable): Civitas Engineering Group Inc

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to terminate the agreement with Civitas Engineering Group Inc., (previously known as KIT Professionals Inc.) for Professional Engineering Services in connection with West Riley Fuzzel Rd- from IH 45 to 200-ft West of West Hardy Rd- 2019, Precinct 3.

end

 

Background and Discussion:

 

Project scope consists of the design and construction of a standard four (4) lane concrete boulevard in 100-ft right of way with 32-ft raised medians and underground storm sewer.   The western segment of the project (from IH 45 to 250-ft west of Elm St.) will be conversion of two (2) lane asphalt to a standard four (4) lane concrete boulevard with 32-ft raised medians in 100-ft right of way. The eastern segment of the project (from 250-ft west of Elm St. to 200-ft west of West Hardy Rd.) will be conversion of recently constructed transitioning concrete roadway and narrow median section (four lanes to two lanes) to a standard four (4) lane concrete boulevard with 32-ft raised medians in 100-ft right of way.  The transition should begin at the end of the 8-ft existing median.

 

Expected Impact:

The design and construction phase will be terminated.

 

 

Alternative Options:

An alternative is to move forward with the design and construction of the project.

 

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

4.9.2019

P2 1.F.10

Recommendation for authorization to negotiate for engineering services in Precinct 4 with:  • KIT Professionals, Inc., in connection with West Riley Fuzzel Road from IH-45 to Elm Street.

6.29.2021

P10 Item 74

Recommendation that the County Judge execute an agreement with KIT Professionals, Inc. in the amount of $526,156 and an approval of funds not to exceed $831,736 for Professional Engineering Services for improvements to West Riley Fuzzel Road from IH 45 to Elm Street, UPIN 20104MF1BY01, Precinct 4.

12.13.2022

P7 item 49

 Request for approval to execute an amendment with KIT Professionals, Inc. in the amount of $370,928.00 for Professional Engineering Services in connection with West Riley Fuzzel Road - From IH 45 to 200-ft West of West Hardy Road - 2019, UPIN 20104MF1BY01, Precinct 3, MWDBE Contracted Goal 73.66%, MWDBE Current Participation 65%.

 

Location: Shaw Road

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/26/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer.

 

Attachments (if applicable): Contract exhibits and Agreement.