Legislation Details

File #: 24-6098    Version: 1 Name:
Type: Report Status: Passed
File created: 9/23/2024 In control: Commissioners Court
On agenda: 10/8/2024 Final action: 10/8/2024
Title: Request for approval of a study report prepared by Zarinkelk Engineering Services, Inc., for Grant Road Segment 3 - from Telge Road to Shaw Road - 2018, UPIN 19104MF10501, Precinct 3.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 19104MF10501

Vendor/Entity Legal Name (if applicable): Zarinkelk Engineering Services, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program

 

Request Summary (Agenda Caption):

title

Request for approval of a study report prepared by Zarinkelk Engineering Services, Inc., for Grant Road Segment 3 - from Telge Road to Shaw Road - 2018, UPIN 19104MF10501, Precinct 3.

end

 

Background and Discussion:

This project is located at Grant Road in Precinct 3 and is adjacent to other capital improvement projects.

 

Expected Impact:

This Study Report will provide the necessary information to proceed with the proposed read improvement project which consists of a 4-lane concrete boulevard in either an 80-foot or 100-foot ROW with a 14-foot or 32-foot raised median and underground storm sewer, additionally, sidewalks will be included from Telge Road to Shaw Road on both sides of Grant Road.

 

Alternative Options:

The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/26/2018

1.e.7

Authorization to Negotiate

11/13/2018

1.g.41

Award - Agreement

 

Location: Grant Road

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 8, 2024

Anticipated Implementation Date (if different from Court date): N/A

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Projects Infrastructure, Harris County Engineering Department

Attachments (if applicable): Study Report