File #: 25-2172    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/26/2025 In control: Commissioners Court
On agenda: 4/10/2025 Final action: 4/10/2025
Title: Request for approval to execute an agreement with Zarinkelk Engineering Services, Inc. for on-call Engineering Services for preliminary engineering services to develop PS&E packages for safety improvements along the toll road system including intersections as part of the Barrier-Free Program, at various locations in Harris County, Texas in the amount of $2,000,000.00 (Countywide, MWBE Contracted Goal: 19.6%).
Attachments: 1. 25-2172 Zarinkelk On-call ESA

 

Primary Department: Toll Road Authority

Primary Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Zarinkelk Engineering Services, Inc.

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Zarinkelk Engineering Services, Inc. for on-call Engineering Services for preliminary engineering services to develop PS&E packages for safety improvements along the toll road system including intersections as part of the Barrier-Free Program, at various locations in Harris County, Texas in the amount of $2,000,000.00 (Countywide, MWBE Contracted Goal: 19.6%).

end

 

Background and Discussion:

On June 4, 2024, the Commissioners Court authorized the solicitation of professional services for engineering design services to develop PS&E packages for safety improvements along the toll road system including intersections as part of the Barrier-Free Program. This will provide feasibility studies and engineering design for safety improvements at various locations Countywide in Harris County, Texas.  

 

As part of the implementation of the Barrier-Free HCTRA Program, professional services are needed to implement the safety improvement projects along the toll road system including 72 of the intersections identified in the 2022 Active Transportation Study for Intersection Safety Strategies. This document evaluates crash data at 134 intersections and recommended safety improvements to assist in protecting pedestrians and bicyclists.

 

The Study and Design Phases will adhere to the following (but not limited to other standards or guidelines as applicable): Harris County Engineering Department (HCED), City of Houston (COH), Texas Department of Transportation (TxDOT), AASHTO Guide for Development of Bicycle Facilities design guidelines, and FHWA Bikeway Selection Guide.

 

Expected Impact:

Funding for this request will come from the Toll Road Authority.

 

Alternative Options:

No other recommended solution for this identified need.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N3: Promote increased physical activity of residents.

Climate/Resilience Initiative (Goal 5): T6: Encourage employees to reduce emissions from commuting and local work trips.

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/4/2024

214

Court approval to advertisement for Professional Services

11/12/2024

122

Court approval to negotiate eight (8) contracts

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

Tolling Solutions

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Revenue - TRA

$

$500,000

$500,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$500,000

$500,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$500,000

$500,000

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 4/10/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

 

Attachments (if applicable): Agreement