Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Secondary Department: Choose an item.
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): 23102MF2UG01
Vendor/Entity Legal Name (if applicable): Concept Engineers Inc
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by Concept Engineers, Inc for Market Street from East Beltway 8 to South Sheldon Street, UPIN 23102MF2UG01, Precinct 2.
end
Background and Discussion:
The project in East Harris County, consists of approximately 9,600 linear lengths of roadway. Concept Engineers was awarded a contract to provide roadway reconstruction and related improvements along Market Street from East Beltway 8 to South Sheldon Street. The goal is to study the existing conditions of Market Street and provide best reconstruction options. Based on that agreement, Concept Engineers Inc has submitted the final study report on April 17, 2025.
Expected Impact:
Alternative Options:
The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
10/18/2022 |
22-6626 |
Approval to negotiate with Concept Engineering, Inc. for Professional Engineering Services related to a Corridor Study for the Reconstruction of the Existing Roadway and Related Improvements along Market Street from East Beltway 8 to Sheldon Road, including intersecting collector streets, UPIN 23102MF2UG01, Precinct 2. |
|
10/11/2022 |
22-6287 |
Request for approval to negotiate with Concept Engineers, Inc. for Professional Engineering Services related to a Corridor Study for the Reconstruction of the Existing Roadway and Related Improvements along Market Street from East Beltway 8 to South Sheldon Road, including intersecting collector streets, UPIN 23102MF2UG01, Precinct 2. |
Location:
Address (if applicable): Market Street from East Beltway 8 to South Sheldon Street
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources FUND :1070 |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 7/18/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Truitt Rounsavall, P.E., PMP, MBA, LSSBB, (Interim) Director of Capital Project Infrastructure, Office of the County Engineer.
Attachments (if applicable): Study report