Legislation Details

File #: 24-2664    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 4/24/2024 In control: Commissioners Court
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Request for approval of an agreement with iGET Services LLC, in the amount of $796,547, for engineering services to provide design, bidding, and construction phase engineering services in support of the Red Bluff Regional Stormwater Detention Basin on HCFCD Unit B509-04-00. (Armand Bayou Watershed, Bond ID C-07, Project ID B509-04-00-E001, Agreement No. 2023-26, Precinct 2, MWDBE Contracted Goal: 20.54%).
Attachments: 1. 050724 AGMT IGET 2023-26 PCT 2 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): B509-04-00-E001

Vendor/Entity Legal Name (if applicable): iGET Services LLC

 

MWDBE Contracted Goal (if applicable): 20.54%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with iGET Services LLC, in the amount of $796,547, for engineering services to provide design, bidding, and construction phase engineering services in support of the Red Bluff Regional Stormwater Detention Basin on HCFCD Unit B509-04-00. (Armand Bayou Watershed, Bond ID C-07, Project ID B509-04-00-E001, Agreement No. 2023-26, Precinct 2, MWDBE Contracted Goal: 20.54%).

end

 

Background and Discussion:

This agreement will provide engineering services for design and construction of Phase 2 of the Genoa Red Bluff stormwater detention basins. The proposed Genoa Red Bluff stormwater detention basins are located within the Armand Bayou watershed along Spring Gully. The site is partially located within the City of Pasadena. The proposed basins are intended to mitigate the future channel improvements from the City of La Porte’s Brookglen Regional Plan. Phase 1 construction has been completed under project B509-03-00-E001.

This project occurs in the 3rd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

 

Expected Impact:

This project seeks to reduce flood risks and strengthen resiliency in the Armand Bayou Watershed by alleviating property and structural damages to the adjacent communities. The project potentially provides up to 1,352-ac-ft of detention along B109-00-00 with reduced flooding for 523 structures, 6.4 miles of roadway and 215 sq-ft of floodplain area under a 100-yr storm event. It will also reduce the financial impact of recovery costs to Harris County and the federal flood insurance program.

 

Alternative Options:

The alternative would be to select another firm for this assignment which would result in significant delays in completing this project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/14/2020

2.b.

ATN for preliminary engineering, design, bidding, and construction phase services

6/8/2021

90.

Agreement 2021-54 for preliminary engineering

3/14/2023

348.

Transmittal of Preliminary Engineering Report

 

Location: Spring Gully, HCFCD Unit B109-00-00

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$796,547

$796,547

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$796,547

$796,547

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$796,547

$796,547

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: May 7, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map