Harris County Logo
File #: 24-1600    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 3/14/2024 In control: Commissioners Court
On agenda: 3/26/2024 Final action: 3/26/2024
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills for 94301/2 North Eldridge Parkway, Houston, TX 77065 (intersection of North Eldridge Parkway and Fetlock Drive) for electrical power serving a traffic signal, UPIN 23035MF2NK01, Precinct 3.
Sponsors: Mony Hossain
Attachments: 1. 24-1600-SOLS - 9430 1-2 N Eldridge Pkwy (3rd Version)

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD., P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): 23035MF2NK01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy, LLC

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the County Auditor to pay monthly bills for 9430½ North Eldridge Parkway, Houston, TX 77065 (intersection of North Eldridge Parkway and Fetlock Drive) for electrical power serving a traffic signal, UPIN 23035MF2NK01, Precinct 3.

end

 

Background and Discussion:

Traffic Signal - North Eldridge Parkway at Fetlock Drive is a project to enhance traffic movements at the existing intersection. The service outlet location statement is needed to establish electrical service from CenterPoint Energy, LLC to power the new traffic signal.

 

Expected Impact:

Approval of the service outlet location statement will allow CenterPoint Energy, LLC to establish electrical service to the traffic signal, which is needed to enhance the operation of the intersection of North Eldridge Parkway at Fetlock Drive.

 

Alternative Options:

All traffic signals require a power source, which is typically obtained through CenterPoint Energy, LLC. Alternative options are to place a generator, which is not reliable, or to not install a traffic signal at the intersection. Both options will negatively impact operations and increase the delay of the intersection.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

August 29, 2023

70

Approved

 

Location:

Address (if applicable): 9430 ½ North Eldridge Parkway, Houston, TX 77065

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other

$

$100

$100

$1200

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$100

$100

$1200

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$100

$100

$1200

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: March 26th, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD., - Director of Community Resilience &

Transportation Planning, HCED

 

Attachments (if applicable): SOLS