Legislation Details

File #: 25-6875    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 10/17/2025 In control: Commissioners Court
On agenda: 10/30/2025 Final action: 10/30/2025
Title: Request for approval to execute a Joint Participation Interlocal Agreement with Harris County Municipal Utility District 368 for modifications to a detention basin, extreme event overflow swale, intersection pavement, pump station and generator and the installation of a new storm force main within Northern Point Subdivision, UPIN 19104MF12W01, Precinct 3.
Attachments: 1. Partnership-19104MF12W01-Northern Point subdivision-HC MUD 368-P3.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Ed Ramsey, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): 19104MF12W01

Vendor/Entity Legal Name (if applicable): Harris County Municipal Utility District 368

 

MWBE Contracted Goal (if applicable): 0%

MWBE Current Participation (if applicable):0%

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Joint Participation Interlocal Agreement with Harris County Municipal Utility District 368 for modifications to a detention basin, extreme event overflow swale, intersection pavement, pump station and generator and the installation of a new storm force main within Northern Point Subdivision, UPIN 19104MF12W01, Precinct 3.

end

 

Background and Discussion:

The Northern Point subdivision has experienced flooding during multiple storm events. Studies performed by the MOD outlined multiple issues that contributed to drainage deficiencies within the subdivision. This subdivision was included in the original list of subdivision drainage projects outlined in the 2018 Flood Control Bond Program.

 

 

 

 

Expected Impact:

The construction of these projects will provide sheetflow paths, improved pumping capacity for the detention basin, increase storage in another basin (Three Lakes East), and add a secondary pump station with backup generation. These improvements will reduce residential flood risk within the Northern Point subdivision.

 

 

 

 

Alternative Options:

To not partner with MUD 368 and continue to have a high flood risk.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Norther Point subdivision in the vicinity of Hufsmith- Kohrville Rd and SH-99 Three Lakes East Basin; in the vicinity of Hufsmith-Kohrville Rd and SH-99

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$1,000,000.00

$1,000,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,000,000.00

$1,000,000.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,000,000.00

$1,000,000.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/30/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Bashar Ahmed, PhD, Chief, Strategy & Business Operations.

 

Attachments (if applicable): Contracts and Exhibits