Legislation Details

File #: 24-4274    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/5/2024 In control: Commissioners Court
On agenda: 7/15/2024 Final action: 7/15/2024
Title: Request that the County Judge execute an amendment to an agreement with Flintco, LLC in the additional amount of $414,448 for additional heating, ventilation, air conditioning (HVAC) services for construction manager at risk for the construction of the 1111 Fannin Renovation Project for Harris County (220079).
Attachments: 1. 24-4274 Amendment Job No. 220079.pdf

Department: Purchasing

Department Head/Elected DeWight Dopslauf

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 220079

Vendor/Entity Legal Name (if applicable): Flintco, LLC

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title 

Request that the County Judge execute an amendment to an agreement with Flintco, LLC in the additional amount of $414,448 for additional heating, ventilation, air conditioning (HVAC) services for construction manager at risk for the construction of the 1111 Fannin Renovation Project for Harris County (220079).

.end

 

Background and Discussion:

Harris County purchased 1111 Fannin to be the new offices for HCED, HCFCD, Purchasing, and HRRM. These four departments will occupy the majority of the building along with Harris County Public Health. This court amendment entails scope pertaining to the building’s 1st Floor and HVAC system. This amendment entails added scope including HVAC changes, installation of new glass in 9 offices on the 11th floor, and removal & replacement of 3 Fan Powered Boxes

 

 

Expected Impact:

The Construction Manager At Risk will provide assistance and guidance to the design team for the procurement of long lead items, constructability, budget, and schedule.

 

 

Alternative Options:

The alternative would be not to make these adds to the scope of the Construction Manager At Risk and to defer needed upgrades and maintenance to the building’s infrastructure.

 

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

_ Flooding

_ Environment

X Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05.25.21

277

FIM Approval

06.29.21

11

RFQ Advertisement - Architecture Services

01.04.22

207

Contract Award - Architecture Services

02.08.22

93

Request for approval to utilize a CMAR (Construction Manager At Risk) delivery method.

03.22.22

283

Transmittal by the Office of the Purchasing Agent of a project scheduled for advertisement for Construction Manager At Risk for the construction of 1111 Fannin.

06.28.22

212

Request for approval of an award to Page Southerland Page, Inc. for professional architectural and/or engineering services.

9/13/2022

279

Request for approval of an award on the basis of highest overall evaluation and authorize negotiations with Flintco, LLC for construction manager at risk for the construction of the 1111 Fannin Renovation Project for Harris County and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (220079), MWDBE Contracted Goal: 20%.

11/29/2022

217

 Request by the Office of the Purchasing Agent that the County Judge execute an agreement with Flintco, LLC for construction manager at risk for the construction of the 1111 Fannin Renovation Project for Harris County, in connection with an award approved by Commissioners Court on September 13, 2022, and that the County Clerk execute applicable bonds to be received (220079), MWDBE Contracted Goal: 20%.

 6/27/2023

276

 Request that the County Judge execute an agreement with Flintco, LLC in the amount of $4,906,574 for the guaranteed maximum price for Construction Manager at Risk for the construction of the 1111 Fannin renovation project for Harris County in connection with an award approved by Commissioners Court on September 13, 2022, and for the County Clerk to execute any applicable bonds to be received (220079), MWDBE Contracted Goal: 16%.

03/26/2024

423

Request that the County Judge execute an agreement with Flintco, LLC in the amount of $12,279,189 for the construction manager at risk for the construction of the 1111 Fannin Renovation project for Harris County (Phase Task Order 2), and for the County Clerk to execute applicable bonds to be received (220079), MWDBE Contracted Goal: 14.8%

 

Location:

Address (if applicable): 1111 Fannin St., Houston TX 77002

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Construction

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper

$

$17,185,763

$17,185,763

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$17,185,763

$17,185,763

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Commercial Paper

$

$414,447.66

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$414,447.66

$

$

Total Funding Request

$

$17,600,210.66

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 7/15/2024

 

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Ross Hosket P.E., CFM, Env SP, Interim Director of Capital Project Facility, Engineering, Nancy Garcia, Harris County Purchasing

 

Attachments (if applicable): Letter, Agreement