File #: 26-4592    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 7/7/2026 In control: Commissioners Court
On agenda: 7/21/2026 Final action:
Title: Request for approval of a change in contract with Reliance Construction Services, LP, in connection with final construction of Water Distribution System - Berwyn Drive - 2024, with a deduction in the amount of $241,293.11, Job No. 24/0430-2, UPIN 24289MF3JQ01, Precinct 2, MWBE Contracted Goal: 22.74%, MWBE Current Participation: 100%.
Attachments: 1. CIC-24289MF3JQ01-Berwyn Drive-24-0430-2.Final-Reliance Constr-P2-07212026.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0430, UPIN 24289MF3JQ01

Vendor/Entity Legal Name (if applicable): Reliance Construction Services, LP

 

MWBE Contracted Goal (if applicable): 22.74%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

...title

Request for approval of a change in contract with Reliance Construction Services, LP, in connection with final construction of Water Distribution System - Berwyn Drive - 2024, with a deduction in the amount of $241,293.11, Job No. 24/0430-2, UPIN 24289MF3JQ01, Precinct 2, MWBE Contracted Goal: 22.74%, MWBE Current Participation: 100%.

...end

 

Background and Discussion:

The project consists of installing a water distribution system to serve Berwyn Drive. in Precinct 2 of Harris County.  The water distribution system includes the installation of waterline along Berwyn Drive, water service connections to existing residences and the decommissioning of existing wells.  Over all 33 Connection Expected is completed.  This change in contract includes:

 

PCO#2 - Final Quantity adjustment - $-241,293.11

 

Expected Impact:

This action allows for the completion of the project as designed and per the contract documents, the Contractor to be compensated for the actual work performed and return the unused fund to Harris County.

 

Alternative Options:

Continue with the original plan.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/13/2025

16 (25-1087)

Contract Award

04/16/2026

44 (26-2233)

Contract Amendment for extension of project term

05/14/2026

381 (26-2794)

Substantial Completion

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other                                                 2601

$

-$241,293.11

-$241,293.11

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$241,293.11

-$241,293.11

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$241,293.11

-$241,293.11

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/21/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B