Legislation Details

File #: 26-0052    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 12/16/2025 In control: Commissioners Court
On agenda: 1/8/2026 Final action: 1/8/2026
Title: Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $6,678,678 for rehabilitation of channels within Barker Reservoir for the Flood Control District and for the County Clerk to execute any applicable bonds to be received (250342), MWBE Contracted Goal: 19.25%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 250342

Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC

 

MWBE Contracted Goal (if applicable): 19.25%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $6,678,678 for rehabilitation of channels within Barker Reservoir for the Flood Control District and for the County Clerk to execute any applicable bonds to be received (250342), MWBE Contracted Goal: 19.25%.

end

Background and Discussion:

The Barker Reservoir located in Precinct 4 receives stormwater flow from multiple channels.  Over time these channels have received significant silt buildup and, in some cases, erosion of the channel slopes. To assure that flows from the surrounding neighborhoods can enter the reservoir, this project will rehabilitate 4 channels, T101-00-00, T103-00-00, T103-03-00 and T204-00-00. Work will involve silt removal, significant bank erosion repair and stabilization, interceptor drain outfall repairs and placement of rip rap erosion protection.  This infrastructure maintenance work will be executed as a result of the passage of the “Maintenance Matters” Proposition in November 2024.

 

Expected Impact:

The intent of this contract is to restore stormwater flows into the reservoir at or near to the original design capacity. This will benefit the neighborhoods upstream of the reservoir as stormwater is able to flow downstream and thereby reducing the potential for the neighborhood flooding. 

 

Alternative Options:

The alternative is not to do the project, but that would result in an increased potential for flooding of the neighborhoods located upstream of the reservoir. 

 

County Strategic Plan Goal:  Choose an item.

County Strategic Plan Objective: Choose an item.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/25/2022

88

Authorization to Negotiate

7/10/2025

235

Approval to Advertise

 

Location:

Address (if applicable): Barker Reservoir

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Tax Revenue - FCD

$

$6,678,678.00

$6,678,678.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$6,678,678.00

$6,678,678.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$6,678,678.00

$6,678,678.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/8/2026

 

Anticipated Implementation Date (if different from Court date): 1/8/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: William Gordon, PE, HCFCD Maintenance Engineering Project Manager; Sheila Rodriguez, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter