Legislation Details

File #: 24-5169    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/15/2024 In control: Commissioners Court
On agenda: 8/27/2024 Final action: 8/27/2024
Title: Request for approval of a change in contract with NBG Constructors, Inc., in connection with final construction of Bridge Replacement - Pedestrian Bridge - P152-00-00, adding 40 calendar days, with an addition in the amount of $8,242.00, Job No. 23/0001-1, UPIN 19104M23F502, Precinct 1, MWDBE Contracted Goal: 12%, MWDBE Current Participation: 18.33%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV-SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0001, UPIN 19104M23F502

Vendor/Entity Legal Name (if applicable): NBG Constructors, Inc.

 

MWDBE Contracted Goal (if applicable): 12%

MWDBE Current Participation (if applicable): 18.33%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with NBG Constructors, Inc., in connection with final construction of Bridge Replacement - Pedestrian Bridge - P152-00-00, adding 40 calendar days, with an addition in the amount of $8,242.00, Job No. 23/0001-1, UPIN 19104M23F502, Precinct 1, MWDBE Contracted Goal: 12%, MWDBE Current Participation: 18.33%.

end

 

Background and Discussion:

Project includes the demolition and replacement of the existing pedestrian bridge with a 107’ prefabricated bridge and 295 LF of asphalt trail extensions to Spanish Oak.

 

This change in contracts includes:

Additions:

(PCO-1) Item #17 - Fold Down Bollard - Adding bollard to bid items. ($2,512.00).

 

(PCO-1) Item #18 - Furnish and Install Hydro Mulch - Adding hydro mulch to bid items to meet HCFCD standards for turf establishment. ($2,530.00).

 

(PCO-1) Item #19 - Furnish and Install Type 3 Barricade - Adding Type 3 barricade to bid items as called out in the plans. ($3,496.00).

 

(PCO-2) Adding 40 days due to the long lead time from the time the bridge shop drawing can be approved to the time the bridge was delivered.

 

Deductions:

(PCO-3) Item #6 - Emulsified Asphalt (Prime Coat) (-$36.00).

 

(PCO-3) Item #7 - Dense-Graded Hot-mix asphalt base course (-$260.00)

 

Expected Impact:

Change allows the contractor to be compensated for the items which were in the plan but missed in the bid tab.

 

Alternative Options:

Reduce the original scope of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/14/2023

23-1688

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$8,242.00

$8,242.00

$

Choose an item.

$

 

$

$

 

$

 

$

$

Total Current Budget

$

$8,242.00

$8,242.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

1080 - Infrastructure Fund

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$8,242.00

$8,242.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: August 27, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B.