File #: 26-3774    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/31/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request for approval to execute an agreement with Omega Engineers, Inc. in the amount of $224,858.00 for Professional Engineering Services in connection with Bikeway Delineation Study and Scott Street Bikeway Preliminary Design from Fuqua Street to South of Beltway 8, UPIN 26101XJ1RR01, Precinct 1, MWBE Contracted Goal: 19.75%.
Sponsors: Mony Hossain
Attachments: 1. (26-3774)-AwardPSA26101XJ1RR01-Bikeway Delineation Study-Omega Engineers-P1-06-11-26.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 26101XJ1RR01

Vendor/Entity Legal Name (if applicable): Omega Engineers, Inc.

 

MWBE Contracted Goal (if applicable): 19.75%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Omega Engineers, Inc. in the amount of $224,858.00 for Professional Engineering Services in connection with Bikeway Delineation Study and Scott Street Bikeway Preliminary Design from Fuqua Street to South of Beltway 8, UPIN 26101XJ1RR01, Precinct 1, MWBE Contracted Goal: 19.75%.

end

 

Background and Discussion:

The study includes two phases.  Phase 1 is to develop a structured methodology to evaluate bikeway delineation options.  Phase 2 is to apply the findings in Phase 1 to Scott Street through preliminary (15%) design to demonstrate feasibility. 

 

Expected Impact:

Develop a catalog of bikeway delineation options. Establish a decision framework that aligns delineation strategies with corridor planning horizons and anticipated traffic growth.  Create reusable design standards for selected delineation options.

 

Alternative Options:

No alternative options. If not approved, delineation study will be delayed or cancelled.

 

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Scott Street from Fuqua Street to South of Beltway 8

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Professional Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$224,858.00

$224,858.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$224,858.00

$224,858.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$224,858.00

$224,858.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 6/11/2026

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Professional Services Agreement & Exhibits