Legislation Details

File #: 25-6173    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of a change in contract with Environmental Allies, Inc., in connection with North Forest Subdivision Drainage Improvements 2018, adding 15 calendar days, with an addition in the amount of $297,064.16, Job No. 24/0359-1, Metro Fund, UPIN 19101MF16R01, Precinct 1, MWBE Contracted Goal: 29.74%, MWBE Current Participation: 40.98%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0359, UPIN 19101MF16R01

Vendor/Entity Legal Name (if applicable): Environmental Allies, Inc.

 

MWBE Contracted Goal (if applicable): 29.74%

MWBE Current Participation (if applicable): 40.98%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Environmental Allies, Inc., in connection with North Forest Subdivision Drainage Improvements 2018, adding 15 calendar days, with an addition in the amount of $297,064.16, Job No. 24/0359-1, Metro Fund, UPIN 19101MF16R01, Precinct 1, MWBE Contracted Goal: 29.74%, MWBE Current Participation: 40.98%.

end

 

Background and Discussion:

The project includes an underground storm sewer system and a wet bottom detention basin. Project also include full-width roadway pavement reconstruction, sidewalk reconstruction and widening, and joint and crack cleaning and sealing throughout the North Forest Subdivision.

 

The change in contract includes the following:

 

Quantity adjustment for Type A, Type B, and Type BB inlets due to the replacement of 39 existing brick-constructed inlets, which are deemed structurally unstable, as requested by the Precinct within the proposed project area.

 

•                     The increase in quantities on line item numbers 4, 7, 15, and 32 for an addition in the amount of $81,688.00

 

New Line Items:

 

•                     Add a new line item “Inlet (Precast) (Type B, Standard Depth, Traffic Rated)”, for an additional amount of $135,277.44.

•                     Add a new line item “Inlet (Precast) (Type BB, Standard Depth, Traffic Rated)”, for an additional amount of $80,098.72.

 

An additional 15 calendar days are added to accommodate the replacement of 39 inlets, which is considered an additional scope of work.

 

The above additions result in a net change in the amount of $297,064.16 and 15 calendar days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the North Forest subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

413 (24-6845)

Transmittal - Advertisement

01/09/2025

269 (25-0270)

Contract Award - Environmental Allies, LLC

 

Location: North Forest subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$297,064.16

$297,064.16

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$297,064.16

$297,064.16

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$297,064.16

$297,064.16

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): Change in Contract (CIC)