Title: Request for approval of a Study Report prepared by Scientech Engineers, Inc. for Corridor Study - Bay Area Blvd - from Fairmont to 1 Mile South - 2022, UPIN 23102MF2Q001, Precinct 2.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Report

 

Project ID (if applicable): UPIN 23102MF2Q001

Vendor/Entity Legal Name (if applicable): Scientech Engineers, Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a Study Report prepared by Scientech Engineers, Inc. for Corridor Study - Bay Area Blvd - from Fairmont to 1 Mile South - 2022, UPIN 23102MF2Q001, Precinct 2.

end

 

Background and Discussion:

This project is located in Precinct 2 of Southeast Harris County, in Laporte, Texas. Scientech Engineers, Inc. was contracted to conduct a Corridor Study to evaluate roadway reconstruction needs and related improvements along Bay Area Boulevard, extending from Fairmont Parkway to 1 mile South. Pursuant to the agreement, Scientech Engineers submitted the final study report on August 22, 2025. The report includes a comprehensive review of existing conditions and proposes design concepts to address roadway, safety, and mobility concerns within the study area.

 

Expected Impact:

The study identified three (3) potential design concepts for consideration. After evaluation, Harris County’s preferred alternative is Design Alternative 1, which focuses exclusively on the development of multi-purpose trails. This option aligns project goals and maintains compliance with budget expectations.

 

Key improvements include the construction of an 8-foot-wide concrete trail with ADA ramps on both sides of the roadway. Installation of a 5-foot safety buffer between the trail and outer traffic lanes. Regarding existing roadside ditches to support stormwater conveyance capacity while accommodating the new trail.

This project will enhance pedestrian and cyclist mobility, improve roadway safety, and provide long-term drainage benefits.

 

Alternative Options: The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/28/2022

22-4003

 

Request for approval to negotiate with Scientech Engineers, Inc. for Professional Engineering Services in connection with Trail along Bay Area Boulevard, Precinct 2.

08/08/2023

23-4460

Request for approval to execute an agreement with Scientech Engineers, Inc. in the amount of $522,761.40 for Professional Engineering Services to provide a Corridor Study for Bay Area Boulevard from Fairmont Parkway to one (1) mile south of Fairmont Parkway, UPIN 23102MF2Q001, Precinct 2, MWDBE Contracted Goal 40.53%.

 

Location:

Address (if applicable): Bay Area Blvd from Fairmont Parkway to 1 mile South of Fairmont Parkway

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants – Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Truitt Rounsavall, P.E., PMP, MBA, LSSBB (Interim) Director of Capital Projects, Horizontal, Office of the County Engineer

 

Attachments (if applicable): N/A