Legislation Details

File #: 26-0577    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/13/2026 In control: Commissioners Court
On agenda: 1/29/2026 Final action: 1/29/2026
Title: Request for approval of a change in contract with Yellowstone Landscape Central, Inc., in connection with final construction of On-Call - Maintenance - Mowing Crosby Camp Area, Precinct 3 - 2023, adding 30 calendar days, with an addition in the amount of $11,925.60, Job No. 23/0313-1, UPIN 23103MF2YB01, Precinct 3, MWBE Contracted Goal: 10%, MWBE Current Participation: 9.22%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0313, UPIN 23103MF2YB01

Vendor/Entity Legal Name (if applicable): Yellowstone Landscape Central, Inc.

 

MWBE Contracted Goal (if applicable): 10%

MWBE Current Participation (if applicable): 9.22%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Yellowstone Landscape Central, Inc., in connection with final construction of On-Call - Maintenance - Mowing Crosby Camp Area, Precinct 3 - 2023, adding 30 calendar days, with an addition in the amount of $11,925.60, Job No. 23/0313-1, UPIN 23103MF2YB01, Precinct 3, MWBE Contracted Goal: 10%, MWBE Current Participation: 9.22%.

end

 

Background and Discussion:

Project includes mowing services of ditches and esplanades for a variety of locations throughout Precinct 3.  The Precinct has requested that new roads to be added and roads to be omitted. This change order allows the Contractor to be compensated for work already completed.

 

The additional work in the change request includes:

•                     PCO-2: 30 Additional Days added to contract

•                     PCO-3: Final Adjustments = $11,925.60

 

Expected Impact:

Change allows Contractor to complete the required work within the Precinct 3 limit.

 

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/31/2023

316 (23-6471)

Contract Award

03/05/2025

63 (25-1365)

Contract Renewal

12/11/2025

328 (25-7602)

Contract Renewal

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$11,925.60

$11,925.60

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$11,925.60

$11,925.60

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$11,925.60

$11,925.60

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/29/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B