Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Grant - Application
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): U.S. Environmental Protection Agency
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to submit an application to the U.S. Environmental Protection Agency for grant funds in the amount of $2,000,000, with a required match of $500,000, for the FY 2023 Clean Water State and Tribal Assistance Grants Program (Cypress Creek Watershed, Precinct 3).
end
Background and Discussion:
It is recommended that the Flood Control District be authorized to apply for grant award funds from the U.S. Environmental Protection Agency FY 2023 Clean Water STAG (Congressionally Directed) Grant Program to fund the construction of the Municipal Utility District 468 (MUD 468) Stormwater Detention Basin Project in the Cypress Creek Watershed. Community Project Funding for this project was secured by Representative Crenshaw. The proposed MUD 468 Stormwater Detention Basin project will further reduce flood risk in the Cedar Bayou Watershed.
Expected Impact:
The MUD 468 Stormwater Detention Basin Project aims to mitigate flooding in the Champion Forest area by enhancing stormwater detention basin capacity and reducing flood risk for hundreds of structures.
The Flood Control District will utilize its resources and applicable consultants during the design and construction phases of the project, as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and Policy regarding Federal Grant Awards.
Alternative Options:
The alternative is to not apply for grant funding, wherein existing flooding risks remain in place, or the project will need to be entirely funded with local funding.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: This action is consistent with the Strategic Plan overarching goals of reducing the number of structures at risk of flooding and improving the quality of life of Harris County residents.
Prior Court Action (if any): N/A
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location: Along the north bank of Cypress Creek, just east of Mischer Preserve, which is at the northeast corner of SH 249 and Cypress Creek (north of Cypresswood Drive).
Address (if applicable):
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
4.a.3 - Engineering Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: FCD CIP Other |
$ |
$500,000 |
$500,000 |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$2,000,000 |
$2,000,000 |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 10/16/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Order, Draft Application, SF424, SF424A, form 4700, form 5700, SF-LLL, SF-6600