Title: Request for approval of a change in contract with MC2 Civil, LLC, in connection with Treaschwig Rd A (Phase 1) - from 1,000' west of Aldine Westfield Rd to west of Cypress Creek - 2014, with an addition in the amount of $1.00, Job No. 23/0420-3, UPIN 14104MF08X01, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 34.78%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0420, UPIN 14104MF08X01

Vendor/Entity Legal Name (if applicable): MC2 Civil, LLC

 

MWBE Contracted Goal (if applicable): 27%

MWBE Current Participation (if applicable): 34.78%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with MC2 Civil, LLC, in connection with Treaschwig Rd A (Phase 1) - from 1,000' west of Aldine Westfield Rd to west of Cypress Creek - 2014, with an addition in the amount of $1.00, Job No. 23/0420-3, UPIN 14104MF08X01, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 34.78%.

end

 

Background and Discussion:

The project consists of construction of Treaschwig Road Segment A Phase 1 project consists of reconstruction and widening of Treaschwig Road from a 2-lane asphalt to a 4-lane concrete roadway from 1000’ west of Aldine Westfield to west of Cypress Creek.   Additionally, extend intersection improvements at Aldine Westfield by 500’ North and South of Treaschwig Road.  Project will construct a wet bottom detention pond adjacent to Cypress Creek.

 

PCO #16 (RFI #44)

PCO #16 (RFI #44) includes revisions to the project scope related to the permanent relocation of the existing 12-inch waterline with 24-inch steel encasement, located east of the Treaschwig Road and Aldine Westfield Road intersection.

Based on revised plan sheets prepared by the Engineer of Record, the total cost for this work is $207,335.00, as reviewed and approved by Vogler & Spencer Engineering, Inc. on behalf of Timber Lane Utility District and concurred by Precinct 3.

Per Precinct request, the total cost for this relocation will be deducted from Line Item 231 - “2″ Thick Clay Liner in Detention Pond, reducing that line item by $207,335.00. As a result, the net value of Change Order #3 for PCO #16 is $1.00.

 

Expected Impact:

Perform waterline relocation per the revised plans on behalf of Timber Lane Utility.

 

Alternative Options:

None at this time.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/19/2023

280 (23-7464)

Contract Award to Main Lane Industries, Ltd.

05/22/2025

190 (25-3169)

Correct Vendor Name to MC2 Civil, LLC

03/27/2025

101 (25-1563)

Contract Amendment #1 for additional funds and extension of project term

11/13/2025

32 (25-7121)

Contract Amendment #2 for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3109

$

$1.00

$1.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1.00

$1.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1.00

$1.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/8/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 