Legislation Details

File #: 25-5626    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/2/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval of a change in contract with Innovative Operations, LLC, in connection with final construction of Sanitary Sewer - Crosby Lynchburg Road at Riverside Drive - 2024, adding 13 calendar days, with no change in the amount, Job No. 21/0451-1, UPIN 25103MF3PT01, Precinct 3.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 21/0451, UPIN 25103MF3PT01

Vendor/Entity Legal Name (if applicable): Innovative Operations, LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Innovative Operations, LLC, in connection with final construction of Sanitary Sewer – Crosby Lynchburg Road at Riverside Drive - 2024, adding 13 calendar days, with no change in the amount, Job No. 21/0451-1, UPIN 25103MF3PT01, Precinct 3.

end

 

Background and Discussion:

This project involves the installation of an 8-inch sanitary sewer line located west of Main Street (Crosby Lynchburg Road), extending from Riverside Street to North Thorn Street.  The scope of work includes trenchless (boring) and open-cut construction methods, installation of new sanitary manholes, removal and replacement of existing asphalt driveways, and all associated miscellaneous work required to successfully complete the project in accordance with approved plans and specifications.

 

This Change in Contract includes:

  • PCO #1 / RFI #1 – A total of 13 additional calendar days has been added to the contract duration due to weather-related delays and unforeseen impacts caused by the property owner's delayed removal of a private fence obstructing access to the work area.

 

 

 

Expected Impact:

Adds 13 calendar days to the contract duration with no change in contract value.  Accounts for weather delays and third-party obstruction (private fence).  Adjusts completion dates accordingly and supports timely contract closeout.

 

Alternative Options:

Proceed without adjusting the contract duration and assess liquidated damages. However, this may result in disputes over non-contractor-related delays (weather and third-party obstruction) and impact final contract closeout.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/27/2025

357 (25-1721)

Contract Renewal

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B