File #: 26-4997    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 7/21/2026 In control: Commissioners Court
On agenda: 8/6/2026 Final action: 8/6/2026
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 24810 1/2 Birnam Wood Blvd, Spring, TX 77373 for electrical power serving traffic signal, Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, UPIN 20104MF1BH01, Precinct 3.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): 20104MF1BH01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

 

MWBE Contracted Goal (if applicable): %

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 24810 1/2 Birnam Wood Blvd, Spring, TX 77373 for electrical power serving traffic signal, Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, UPIN 20104MF1BH01, Precinct 3.
end

 

Background and Discussion:

This traffic signal will be part of this project which consists of extending Extend Birnam Wood Blvd. from J10901-01 to Cypresswood, as a 4-lane concrete pavement section with underground storm. Upgrade from 2-lane concrete 1/2 boulevard section to 4-lane concrete curb and gutter boulevard with 32' raised median within a 100' ROW. The service outlet location statement is needed to establish electrical service from Center Point Energy to power the new traffic signal on Birnam Wood Blvd at Fern Hill Dr.

Expected Impact:

Approval of the service outlet location statement will allow CenterPoint Energy to establish electrical service to the permanent traffic signal, which is needed to enhance the operation of the intersection of Birnam Wood Blvd at Fern Hill Dr.


Alternative Options:

All traffic signals require a power source, which is typically obtained through CenterPoint Energy. Alternative options are to place a generator, which is not reliable, or not installed/remove the traffic from the intersection. Both options pose a public safety concern and will impact the operation and increase delay of the intersection.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 24810 1/2 Birnam Wood Blvd, Spring TX 77373

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1000 - General Fund

$

$

$

$1200.00

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$1200.00

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$1200.00

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/6/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

Attachments (if applicable): CNP Electric SOL’s