File #: 24-0936    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/13/2024 In control: Commissioners Court
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Request for approval of an agreement with A&R Engineering and Testing, Inc., in the amount of $182,976, to provide materials engineering and testing services in support of the Mercer Stormwater Detention Basin construction project. (Cypress Creek Watershed, Bond ID F-88, Project ID K500-21-00-E001, Agreement No. 2023-31, Precinct 1, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible).
Attachments: 1. 022724 AGMT AR ENG. 2023-31 PCT 1 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): K500-21-00-E001

Vendor/Entity Legal Name (if applicable): A&R Engineering and Testing, Inc.

 

MWDBE Contracted Goal (if applicable): 0%

MWDBE Current Participation (if applicable): 0%

Justification for 0% MWDBE Participation Goal:  0% - Non-Divisible

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with A&R Engineering and Testing, Inc., in the amount of $182,976, to provide materials engineering and testing services in support of the Mercer Stormwater Detention Basin construction project. (Cypress Creek Watershed, Bond ID F-88, Project ID K500-21-00-E001, Agreement No. 2023-31, Precinct 1, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible).

end

 

Background and Discussion:

The project site is located within north Harris County, east of Hardy Toll Road, north of F.M. 1960, and south of Cypress Creek (HCFCD Unit No. K100-00-00). The purpose of this project is to reduce the risk of flood damage within the Cypress Creek watershed. The proposed detention basin will provide approximately 512 acre-feet of total stormwater detention volume while reducing water surface elevation level and peak flows along Cypress Creek during storm events. It will also remove the 100-year floodplain from approximately 30 structures.

 

Expected Impact:

Materials engineering and testing services on this project will provide essential quality control and assurance, ensuring that soils and construction materials meet specified standards and performance criteria, ultimately leading to enhanced structural integrity and longevity while reducing risks and costs associated with earthen and material failures. This quality control and assurance will help ensure that the project is constructed properly so that the Flood Control District provides stormwater detention and assists with alleviating flooding.

 

Alternative Options:

The alternative would be to select another firm for this assignment which would result in a delay in starting this project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/31/2023

149.

ATN

 

Location: North Harris County, east of Hardy Toll Road, north of F.M. 1960, and south of Cypress Creek

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.2 - Construction Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$100,000

$100,000

$82,976

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$100,000

$100,000

$82,976

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$100,000

$100,000

$82,976

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: February 27, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map