Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): K500-21-00-E001
Vendor/Entity Legal Name (if applicable): A&R Engineering and Testing, Inc.
MWDBE Contracted Goal (if applicable): 0%
MWDBE Current Participation (if applicable): 0%
Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible
Request Summary (Agenda Caption):
title
Request for approval of an agreement with A&R Engineering and Testing, Inc., in the amount of $182,976, to provide materials engineering and testing services in support of the Mercer Stormwater Detention Basin construction project. (Cypress Creek Watershed, Bond ID F-88, Project ID K500-21-00-E001, Agreement No. 2023-31, Precinct 1, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible).
end
Background and Discussion:
The project site is located within north Harris County, east of Hardy Toll Road, north of F.M. 1960, and south of Cypress Creek (HCFCD Unit No. K100-00-00). The purpose of this project is to reduce the risk of flood damage within the Cypress Creek watershed. The proposed detention basin will provide approximately 512 acre-feet of total stormwater detention volume while reducing water surface elevation level and peak flows along Cypress Creek during storm events. It will also remove the 100-year floodplain from approximately 30 structures.
Expected Impact:
Materials engineering and testing services on this project will provide essential quality control and assurance, ensuring that soils and construction materials meet specified standards and performance criteria, ultimately leading to enhanced structural integrity and longevity while reducing risks and costs associated with earthen and material failures. This quality control and assurance will help ensure that the project is constructed properly so that the Flood Control District provides stormwater detention and assists with alleviating flooding.
Alternative Options:
The alternative would be to select another firm for this assignment which would result in a delay in starting this project.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
10/31/2023 |
149. |
ATN |
Location: North Harris County, east of Hardy Toll Road, north of F.M. 1960, and south of Cypress Creek
Address (if applicable):
Precinct(s): Precinct 1
Fiscal and Personnel Summary |
Service Name |
4.a.2 - Construction Services |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Bonds |
$ |
$100,000 |
$100,000 |
$82,976 |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$ |
$100,000 |
$100,000 |
$82,976 |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$100,000 |
$100,000 |
$82,976 |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: February 27, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Agreement and Map