Legislation Details

File #: 24-6751    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/17/2024 In control: Commissioners Court
On agenda: 10/29/2024 Final action: 10/29/2024
Title: Request for approval of an agreement with Lockwood, Andrews & Newnam, Inc., in the amount of $1,460,136 for engineering services to provide design, bidding, and construction phase engineering services in support of the Lauder Stormwater Detention Basin Phase 2 Compartment 2 on HCFCD Unit P500-06-00 (Greens Bayou Watershed, Bond ID C-34, Project ID P500-06-00-E007, Agreement No. 2024-68, Precinct 2, MWDBE Contracted Goal: 19.84%).
Attachments: 1. 102924 AGMT LAN 2024-68 PCT 2 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): P500-06-00-E007

Vendor/Entity Legal Name (if applicable): Lockwood, Andrews & Newnam, Inc.

 

MWDBE Contracted Goal (if applicable): 19.84%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with Lockwood, Andrews & Newnam, Inc., in the amount of $1,460,136 for engineering services to provide design, bidding, and construction phase engineering services in support of the Lauder Stormwater Detention Basin Phase 2 Compartment 2 on HCFCD Unit P500-06-00 (Greens Bayou Watershed, Bond ID C-34, Project ID P500-06-00-E007, Agreement No. 2024-68, Precinct 2, MWDBE Contracted Goal: 19.84%).

end

 

Background and Discussion:

This continuation of services agreement request allows for design services for Phase 2 Compartment 2 of the Lauder Stormwater Detention Basin.  Construction of this phase will be funded via the CDBG-DR program.  Phase 2 Compartment 2 of the Lauder Stormwater Detention Basin project is a component of the regional plan for the Greens Bayou Mid-Reach Study (Montgomery, 2007) that is designed to provide stormwater detention storage to reduce flooding that drains to Greens Bayou. This project occurs in the 3rd quartile under the 2022 Prioritization Framework.

 

Expected Impact:

The expected impact of this project is to mitigate future Flood Control District channel conveyance improvements for Greens Mid Reach and P138-01-01, mitigate Harris County Recovery and Resiliency neighborhood drainage improvement projects in High Meadows and Castlewood, and mitigate a future Harris County Housing & Community Development low-moderate housing project for Connorvale in Aldine.

 

Alternative Options:

There is no viable alternative to this request as this is the last stage of the recommend stormwater detention for this site under the Greens Bayou Mid-Reach Study (2007).

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6-25-2019

2.b.4

Authorization to Negotiate - Agmt. No. 2020-60

10-29-2019

2.a.7

Agreement

4-27-2021

89.

Amendment No. 1

1-31-2023

146.

Amendment No. 2

6-6-2023

115.

GLO Contract No. 24-033-00-E072 (CDBG-DR) - Project Federalized

6-4-2024

472.

Amendment No. 1 to GLO Contract No. 24-033-00-E072 (CDBG-DR) - Project Application approved

 

Location: Greens Bayou Watershed

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$1,000,000

$1,000,000

$460,136

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$1,000,000

$1,000,000

$460,136

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$1,000,000

$1,000,000

$460,136

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 29, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map