Legislation Details

File #: 24-4211    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 7/3/2024 In control: Commissioners Court
On agenda: 7/15/2024 Final action: 7/15/2024
Title: Request for approval of a Letter of No Objection with Gulf South Pipeline Company, LLC to perform the proposed replacement of existing Culverts with 18" RCP culverts, add cover and erosion protection to ditches and rebuild driveways inside Gulf South's right of way ("Right of Way") on its Agua Dulce Perryville Index 129, a 30" high pressure natural gas pipeline from provided drawings dated 12/13/2023, in connection with Timberlake Estates Subdivision Drainage Improvements 2018, UPIN 19103MF17E01, Precinct 3.
Sponsors: Mony Hossain
Attachments: 1. 24-4211-24GEN1074 Timberlake - Gulf South Pipeline Company LLC_Letter of No Objection CAO

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): UPIN 19103MF17E01

Vendor/Entity Legal Name (if applicable): Gulf South Pipeline Company, LLC

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a Letter of No Objection with Gulf South Pipeline Company, LLC to perform the proposed replacement of existing Culverts with 18” RCP culverts, add cover and erosion protection to ditches and rebuild driveways inside Gulf South’s right of way (“Right of Way”) on its Agua Dulce Perryville Index 129, a 30” high pressure natural gas pipeline from provided drawings dated 12/13/2023, in connection with Timberlake Estates Subdivision Drainage Improvements 2018, UPIN 19103MF17E01, Precinct 3.

end

 

Background and Discussion:

The project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Timberlake Estates subdivision. This LONO allows Harris County to construct in the vicinity of Gulf South Pipeline Company, LLC’s Right of Way.

Expected Impact:

Allows for Construction to be executed within Gulf South Pipeline Company, LLC right of way (“Right of Way”).

 

Alternative Options:

If action is not taken, the Pipeline Company could stop work without executed agreement, and delay start of construction.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

N/A

N/A

N/A

 

Location: Timberlake Estates Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: July 15, 2024

Anticipated Implementation Date (if different from Court date): July 19, 2024

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Letter of No Objection