Title: Request for approval of a change in contract with Skilled Construction Subs Unlimited in connection with final construction of Sidewalk - Uvalde Road from Wallisville Road to Holly Park Drive - 2022, with a deduction in the amount of $95,601.46, Job 24/0111-1, UPIN 23102MF2QS01, Precinct 2, MWBE Contracted Goal: 24%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job 24/0111, UPIN 23102MF2QS01

Vendor/Entity Legal Name (if applicable): Skilled Construction Subs Unlimited

 

MWBE Contracted Goal (if applicable): 24%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Skilled Construction Subs Unlimited in connection with final construction of Sidewalk - Uvalde Road from Wallisville Road to Holly Park Drive - 2022, with a deduction in the amount of $95,601.46, Job 24/0111-1, UPIN 23102MF2QS01, Precinct 2, MWBE Contracted Goal: 24%.

end

 

Background and Discussion:

The project consists of the construction of approximately 10,044 LF of 6-foot-wide sidewalks on both sides of Uvalde Road from Wallisville Road to Holly Park Drive Sidewalk Improvements include construction of sidewalks, ADA ramps, and driveways, replace broken curbs, damaged slope paving, and driveways.

 

The budget variances across the project resulted from a mix of effective resource management, value engineering, and strategic procurement that led to cost savings in some areas, while necessary scope adjustments, unforeseen site conditions, and regulatory compliance requirements caused certain items to exceed their budgeted amounts.  This change order will deduct -$95,601.46.

 

Expected Impact:

Deduct the total cost for the contract

 

 

Alternative Options:

No action will result in substandard construction.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/25/2024

294 (24-3965)

Contract Award

08/07/2025

418 (25-4385)

Substantial Completion

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund                     3021, 3002

$

-$95,601.46

-$95,601.46

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$95,601.46

-$95,601.46

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$95,601.46

-$95,601.46

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 