Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: County Engineer
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 170274
Vendor/Entity Legal Name (if applicable): Johnston, LLC
MWBE Contracted Goal (if applicable): 0%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Grant Indirect Costs Rate (if applicable): 90%
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Rate is not 0% and is listed above.
Request Summary (Agenda Caption):
title
Request that the County Judge execute an amendment to an agreement with Johnston, LLC in the additional amount of $63,990 to construct a large lift station and several sump pumps powered by emergency generator for professional architectural and engineering services for the design of restoration and mitigation efforts on Harris County buildings (170274), Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.
end
Background and Discussion:
The Harris County Downtown Tunnel System connects and provides access to 15 County buildings in Downtown Houston. This project aims to mitigate flooding by installing a large lift station with several sump pumps, powered by an emergency generator on the most vulnerable part of the tunnels, covering the area from the Criminal Justice Center to the Juvenile Justice Center and Civil Court house, to ensure proper flood water removal during extreme weather events.
Expected Impact:
This amendment will approve additional professional services for providing boring information at a depth of 50 ft, to enable design of trench protection and dewatering systems during construction. Design revisions will eliminate the north retaining wall from the scope, provide an access gate to the lift station at the south retaining wall, provide coping and finishing details for the south retaining wall and the CMU wall enclosure for the generator.
Alternative Options:
Not approving this request, thus preventing the construction of the lift station from commencing, due to lack of soil information at a depth of 50 ft.
County Strategic Plan Goal: N/A
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
1/8/2026 |
13. |
Request that the County Judge execute an amendment to an agreement with Johnston, LLC in an additional amount of $11,500.00 for flood mitigation efforts to be implemented in the Downtown Tunnel System on Harris County buildings (170274), UPIN 18035MF0X201, Precinct 1, Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program. |
|
08/23/2022 |
325 |
Request that the County Judge execute an amendment to an agreement with Johnston LLC in the additional amount of $281,000 for flood mitigation efforts to be implemented in the Downtown Tunnel System for professional architectural and engineering services for the design of restoration and mitigation efforts on Harris County buildings (170274). |
|
02/09/2021 |
224 |
Request that the County Judge execute an amendment to an agreement with Johnston, LLC, in the additional amount of $149,500 for flood mitigation efforts to be implemented in the Harris County downtown tunnel system for architectural and engineering services for the design of restoration and mitigation efforts on county buildings (170274). |
|
08/13/2019 |
|
Amendment to Master Agreement with Johnston, LLC to include certain federal contract provisions applicable to the Federal Emergency Management Agency. |
|
04/10/2018 |
19.d.8.c |
Approval for $394,500 for studying flooding in Tunnel System |
Location:
Address (if applicable): 201 Caroline St Houston, TX 77002
Precinct(s): Countywide
|
Fiscal and Personnel Summary |
|
Service Name |
Professional Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Commercial Paper 3259 |
$ |
$63,990.00 |
$63,990.00 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$63,990.00 |
$63,990.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$63,990.00 |
$63,990.00 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 5/14/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Office of County Engineer, Nancy Garcia, HC Purchasing