Harris County Logo
File #: 24-5806    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/6/2024 In control: Commissioners Court
On agenda: 9/19/2024 Final action: 9/19/2024
Title: Request for approval of a change in contract with Ballast Point Construction, Inc., in connection with Trail - Fairmont Parkway from HCFCD B100 to Red Bluff Drive - 2021, with an addition in the amount of $20,356.90, Job No. 23/0224-4, UPIN 22102MF2FC01, Precinct 2, MWDBE Contracted Goal: 30%, MWDBE Current Participation: 22.41%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0224, UPIN 22102MF2FC01

Vendor/Entity Legal Name (if applicable): Ballast Point Construction, Inc.

 

MWDBE Contracted Goal (if applicable): 30%

MWDBE Current Participation (if applicable): 22.41%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Ballast Point Construction, Inc., in connection with Trail - Fairmont Parkway from HCFCD B100 to Red Bluff Drive - 2021, with an addition in the amount of $20,356.90, Job No. 23/0224-4, UPIN 22102MF2FC01, Precinct 2, MWDBE Contracted Goal: 30%, MWDBE Current Participation: 22.41%.

end

 

Background and Discussion:

Construction of 10-foot-wide trail along Fairmont Parkway from Armand Bayou Hike and Bike Trailhead to Red Bluff Drive, with a pedestrian bridge at Armand Bayou (B100-00-00).  Proposed trail includes upgraded audio pedestrian signals, crosswalks, and ramps at signalized intersections at Center Street and Red Bluff Drive.

 

Bid Item #023 conflicts with the construction plans by specifying a 6-inch HES thickness for the driveway while the plans clearly indicate a required 10-inch concrete slab.  As confirmed by the engineer, the discrepancy is due to an error in the bid item and does not reflect the project design.  This change will add additional amount of $20,356.90 and no additional days.

 

Expected Impact:

Increase the total cost for the contract.

 

Alternative Options:

No action will result in substandard construction.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/08/2023

23-4290

Contract Award

06/04/2024

24-3097

Contract Amendment #1 for additional funds and extension of project term

07/15/2024

24-4095

Contract Amendment #2 for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3109

$

$20,356.90

$20,356.90

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$20,356.90

$20,356.90

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$20,356.90

$20,356.90

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: September 19, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B