Title: Request for discussion and possible action for approval to issue a purchase order in an amount not to exceed $343,204.21 to Aramark Facility Services for the LED lighting retrofit of the 7th floor at 701 N San Jacinto (Harris County Detention Facility) under the existing Aramark facilities management contract, with a procurement deadline of the week of May 18, 2026.
Sponsors: Mony Hossain
Attachments: 1. 26-2991- 701 San Jacinto - 7th Floor LED Project Back up documents (002).docx.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Sheriff

Secondary Department Head/Elected Official: ED Gonzales

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Discussion Item

 

Project ID (if applicable): 701 San Jacinto Maintenance Projects

Vendor/Entity Legal Name (if applicable): Aramark

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for discussion and possible action for approval to issue a purchase order in an amount not to exceed $343,204.21 to Aramark Facility Services for the LED lighting retrofit of the 7th floor at 701 N San Jacinto (Harris County Detention Facility) under the existing Aramark facilities management contract, with a procurement deadline of the week of May 18, 2026.

end

 

Background and Discussion:

The 7th floor of 701 N San Jacinto currently operates 1,163 fluorescent light fixtures on a continuous 24/7 fixed-output schedule. These fixtures consume energy at a sustained rate with no dimming controls, contributing materially to the facility's annual electricity cost of $824,818.57 (actual TXU Energy billing, March 2025 through February 2026).

 

An LED lighting upgrade was first considered in October 2025, when Aramark submitted a full fixture replacement proposal at $1,184,790. That proposal was placed on hold for higher priority projects. In March 2026, Aramark submitted an alternative approach: an LED retrofit that installs new LED kits and bulbs into existing fixture housings in lieu of full fixture replacement. The firm-price retrofit quote of $343,204.21 (dated March 18, 2026).

 

A financial analysis was prepared in April 2026 to support this Court request. All projections use a 35% LED energy savings rate, a moderate conservative figure, applied because the detention facility environment operates on 24/7 fixed-output lighting without dimming controls, which impacts achievable savings relative to the U.S. Department of Energy benchmark midpoint of 40%. A 3% annual energy cost escalation rate was applied to all multi-year projections.

 

Options Considered:

Four options were evaluated for Commissioners Court consideration:

 

Option

Capital Cost

Payback

10-Yr Net Return

Notes

Full Fixture Replacement (Oct 2025)

$1,184,790

N/A

N/A

On hold

LED Retrofit - 7th Floor Only

$343,204

8.3 yrs

$129,577

Firm quote 3/18/26

LED Retrofit - Full Facility (Long-Range)

$2,700,000*

9.4 yrs

$609,467

Projected; per-floor quotes required

No Action / Status Quo

$0 capital

N/A

($824,819)/yr ongoing energy cost

Energy & maintenance costs continue at current rate

 

* Full facility cost of $2,700,000 is a projection based on the 7th-floor per-floor rate applied to all 7 floors with slight adjustment for condition variability. Individual floor quotes are required before phased commitments are made.

 

Expected Impact:

If authorized, the following financial and operational outcomes are anticipated for the 7th-floor LED retrofit:

•                     Capital investment: $343,204.21 (firm Aramark quote, March 18, 2026)

•                     Estimated Year 1 energy savings: $41,241 (35% savings applied to pro-rated 1/7 facility energy share of $117,831/yr)

•                     Simple payback period: 8.3 years

•                     Estimated break-even year: Year 8

•                     10-year cumulative energy savings: $472,781 (with 3% annual escalation)

•                     10-year net return: $129,577

•                     10-year ROI: 37.8%

 

Operational benefits include reduction of recurring lamp and ballast maintenance costs associated with fluorescent fixtures.

 

Alternative Options:

Three alternatives to the proposed 7th-floor LED retrofit were considered:

•                     Full Fixture Replacement (Original Proposal, Oct 2025): Quoted at $1,184,790 by Aramark. Placed on hold in lieu of higher priority maintenance projects on the 7th floor.

•                     Full Facility LED Retrofit (Long-Range Option): Estimated at $2,700,000 for all 7 floors. This option requires individual floor quotes and separate procurement action.

•                     No Action / Status Quo

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: C: Improve safety and health conditions in the jail.

Justice/Safety Initiative (Goal 1):  C1: Support the Jail and Community Safety Infrastructure Governance Advisory Committee’s and Resident Advisory Committee’s efforts to increase non-carceral options and improve safety, security, and other conditions in jail facilities.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

2/12/2026

5(26-1037)

Request for approval of a Preliminary Investment Memo for the Jail Infrastructure Planning and Governance project, for an initial amount of $1,253,180 and request for approval of initial commercial paper funding in the amount of $1,255,000.

 

Location:

Address (if applicable):

Precinct(s): Choose an item.

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other CP

$

$343,204.21

$343,204.21

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$343,204.21

$343,204.01

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$343,204.21

$343,204.21

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

Anticipated Implementation Date (if different from Court date): 5/15/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Samuel, Pena: Chief, Infrastructure Services, and Disaster Recovery

 

 

Attachments (if applicable):