Title: Request for approval of a change in contract with Tree Guy LLC in connection with Clearing of Right-of-Ways and Related Items for Harris County, adding 15 calendar days, with an addition in the amount of $6,534.00, Job No. 20/0258-1, UPIN 21208MF1WZ01, Precinct 3.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 20/0258; UPIN: 21208MF1WZ01

Vendor/Entity Legal Name (if applicable): Tree Guy LLC

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Tree Guy LLC in connection with Clearing of Right-of-Ways and Related Items for Harris County, adding 15 calendar days, with an addition in the amount of $6,534.00, Job No. 20/0258-1, UPIN 21208MF1WZ01, Precinct 3.

end

 

Background and Discussion:

 

The project is located in Crosby, TX, within Harris County. The section of Franta Addition Neighborhood that is within the scope of this project is bounded by Miller Wilson Road on the west, by Franta Road to the north, the existing shallow drainage swale on the east and the existing railroad embankment to the south. There are two segments of drainage channel proposed for improvement: a smaller swale draining due south from Franta Road to the railroad tracks, and a larger channel draining to the southwest toward Miller Wilson Road. The scope and proposed improvements include clearing and grubbing within and in the vicinity of these two channels as per the approved plans.  Construction of these improvements to be performed by Tree Guy, LLC, ensures that the project is built in accordance with Harris County and Harris County Flood Control regulations.

 

The Change in contract request new items for the following:

 

                     PCO-1: Hydro-mulching - Added New Item “Hydro-mulching” additional cost for the amount of $6,534.00 and added 15 days. Change in contract is due to the Hydro-mulching not being included in the initial contract with Tree Guy, LLC. However, plans call for erosion control and the precinct has requested that hydro-mulching be completed. 

 

Expected Impact:

This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This modification is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Franta Addition Neighborhood, Harris County, and FEMA. The fiscal impact for this project will come from the 1080 Fund, for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact to project schedule or staffing anticipated.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the project

area will continue to experience flood risk.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10-25-2022

153

Contract Awarded

 

 

 

 

 

 

 

Location:

Address (if applicable): Franta Street and Miller Wilson Road, Crosby, TX

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

FY 23

FY 24

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$6,534.00

$

$

Total Incremental Expenditures

$6,534.00

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

1080 - Infrastructure Fund

$6,534.00

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$6,534.00

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$6,534.00

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: November 14, 2023

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Director if Disaster & Recovery Resiliency Division, Harris County Engineering Department

Attachments (if applicable): Change in Contract (CIC)