File #: 24-5829    Version: 1 Name:
Type: Investment Memo Status: Passed
File created: 9/6/2024 In control: Commissioners Court
On agenda: 9/19/2024 Final action: 9/19/2024
Title: Request for approval of a Final Investment Memo for the Elevator Repair and Renovations Countywide projects for an FY2025 authorization of $9,100,000[MB1][TW(oMaB2].
Sponsors: Mony Hossain

Department: County Engineer

Department Head: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Investment Memo

Investment Memo Type: Final Investment Memo

 

Project Name: Elevator Repair and Renovations Countywide

Project ID (if applicable): MF0ELEVATORS

Vendor Legal Name (if applicable): N/A

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Achievement (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Managing Entity: County Engineer

Incremental Authorization Requested: $9,100,000

Total Estimated Project Cost: $25,000,000

 

Request Summary:

title

Request for approval of a Final Investment Memo for the Elevator Repair and Renovations Countywide projects for an FY2025 authorization of $9,100,000.

end

 

Project Description:

This is a continuous lifecycle management project to identify and address all required upgrades and modernization of elevators in County facilities that are currently maintained by Building Operations Services (BOS). This project addresses elevator equipment in multiple County facilities that are outdated and where replacement parts are not readily available and, in some cases, no longer available.

 

Project Scope:

Elevator Upgrade and Modernizations Countywide is a Program within BOS’s Capital Improvement Plan for asset/equipment replacement and major upgrade projects. The detailed project scope for FY25 is listed below.

There might be changes in the County’s needs that result in minor operational changes for the project throughout the Fiscal Year, but the overall scope will remain the same, and any additional authorization would go through Commissioners Court approval.

 

Justification:

The County has a schedule to address elevator deferred maintenance. Failure to continue maintaining the County's existing facilities may result in more expensive deferred maintenance, as well as the closure of certain areas, non-code compliance, and, most importantly, risks to life/safety. Elevators are linked to building fire alarm systems to ensure they operate properly during an event. Another elevator safety issue is people getting trapped in an elevator when they break down. Ongoing elevator entrapments or failures are a potential life safety issue. Elevators need to be modernized to avoid outages and entrapments. Modernized elevators increase the flow of employees and visitors throughout the facility, which is critical for efficient building operations. When elevators are out of service, it disrupts the building’s ability to maintain operations.

HCED continues to experience the effects of previous years’ inflation regarding materials and labor for construction projects.  Although inflation for costs of materials and labor is expected to increase at historical averages in FY2025, the increases from previous years are expected to remain.

 

Alternatives and Engagement:

Not funding this program would lead to an even greater backlog of deferred maintenance to perform later and, in some cases, could create hazards to life and safety. Delay in project timeline may increase costs due to increased deterioration of infrastructure, potential bid increases, and increase in material and labor costs.

 

Anticipated Project Expenditures and Timeline:

Scope of Work

FY2025 Estimated Cost

Estimated Completion

Civil Courthouse low bank, freight, and Northside Judge’s Elevator (8 elevators)

$3,800K

FY2026

Civil Courthouse Escalators

$2,500K

FY2025

601 Lockwood Elevator

$600K

FY2025

Leadership Academy

$250K

FY2025

Annex 9 Elevator

$200K

FY2025

Annex 14 Elevator

$250K

FY2025

Contingency on Projects

$1,500K

 

Total

9,100K

 

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Previous Court Action:

Date

Agenda Item #

Action Taken

8/1/2017

4.d.3

$3M CP allocation

12/18/2018

1.s.1

$3.6M authorization

1/8/2019

4.i.3

$3.6M CP allocation

6/4/2019

CIP

$1M authorization in interim CIP

8/27/2019

4.e.7

$1M CP allocation

1/7/2020

II.1.c

$5M authorization in FY20 CIP

1/28/2020

4.g.2

$3M CP allocation

5/19/2020

4.f.3

$2M CP allocation

3/9/2021

88

Harris County - Proposed Capital Improvements Program; Facility and Maintenance Projects: Elevator Repair and Renovations Countywide, pages 281 and 287 ($1.35M authorization for FY21-22).

8/24/2021

94

$2,098,500 incremental authorization for FY21-22, $885K CP allocation.

3/8/2022

107

Request for approval of a Final Investment Memo for the Elevator Repair and Renovations Countywide project for an additional $2,838,000 for SFY 22 and request for approval of commercial paper funding for Engineering for the project in the additional amount of $1,185,000 (p.13).

10/18/2022

122

Request for approval of a Final Investment Memo for the Elevator Repair and Renovations Countywide project for an additional $981,000 for a FY 2023 authorization of $6,213,000. 22-6656.

8/29/2023

103

Request for approval of a Final Investment Memo for the Elevator Repair and Renovations Countywide project for an additional $7,190,000 for a FY24 authorization of $8,161,000.

 

Address: Multiple

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

 

 

 

 

 

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 09/19/2024

Anticipated Implementation Date (if different from Court date):

Legal funding compliance confirmed by: Paige Abernathy, Assistant County Attorney, 7/19/2024

Department Approval by: Rosalie Brockman. Director - Building Resiliency & Sustainability Operations

OMB CIP Team Approval by: Wanwei Tang, Analyst - Capital Projects and Infrastructure, 8/12/24

 

Commercial Paper Request (For OMB use only):

Receiving Department: Choose an item.

Project PeopleSoft ID:

CP Series Description:

OMB Financial Management contact: