Title: Request for approval of a change in contract with E.P. Brady, LTD in connection with Kingslake Forest Subdivision Drainage Improvements adding 53 calendar days, Job No. 22/0348-3, UPIN 19101MF17A01, Precinct 1, MWDBE Contracted Goal: 20.00%, MWDBE Current Participation: 17.63%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 19101MF17A01 - Job No. 22/0348

Vendor/Entity Legal Name (if applicable): E.P. Brady, LTD

 

MWDBE Contracted Goal (if applicable): 20.00%

MWDBE Current Participation (if applicable): 17.63%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with E.P. Brady, LTD in connection with Kingslake Forest Subdivision Drainage Improvements adding 53 calendar days, Job No. 22/0348-3, UPIN 19101MF17A01, Precinct 1, MWDBE Contracted Goal: 20.00%, MWDBE Current Participation: 17.63%.

end

 

Background and Discussion:

Kingslake Forest Subdivision located in Northeast Harris County, Texas, Precinct 1. Under existing conditions,

the Kingslake Forest Subdivision has experienced flood damage during extreme rainfall events. The project will

include storm sewer improvements along multiple streets in the neighborhood. The proposed drainage

improvements will consist of removal and replacement of existing storm sewers, as well as replacement of the

inlets. A detention basin will also be added to the southeastern portion of the neighborhood, to mitigate for

the impacts to Greens Bayou tributary P127-00-00 from the aforementioned improvements. This detention

basin will be dry bottom basin, with a perimeter concrete trail. The basin may include recreational features such as mature trees, signage, trash receptables, and benches.

 

The Change in contract request includes new items for the following:

•                     PCO - 6 Utility Conflicts - Added 53 days for an extension of the critical path due to a conflict with an existing sanitary sewer line requiring the redesign of a 60-inch reinforced concrete pipe alignment, and a conflict with a Comcast pedestal.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Kingslake Forest Subdivision.

 

 

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the original scope of work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/29/2022

157

Contract Award

08/29/2023

185

Second Amendment Approved

09/19/2023

62

Change Order Approved

12/19/2023

64

Change Order Approved

 

Location: Kingslake Forest Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Harris County Engineering Department

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$0.00

$0.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$0.00

$0.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$0.00

$0.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: March 26, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 