Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 24104MF3B601
Vendor/Entity Legal Name (if applicable): MBCO Engineering LLC
MWBE Contracted Goal (if applicable): 20.09%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with MBCO Engineering LLC in the amount of $981,005.00 for Professional Engineering Services for Sidewalk - Various Locations HCMUD 102 - 2024, UPIN 24104MF3B601, Precinct 4, MWBE Contracted Goal: 20.09%.
end
Background and Discussion:
The request will allow Harris County to initiate both the study and design phase with MBCO Engineering LLC to provide professional engineering services for assessment and improvements along major roadways within HC MUD 102 for existing pedestrian mobility and drainage conditions.
Expected Impact:
This project would expedite assessments of the existing mobility and drainage conditions along the roadways; followed by developing improvement to address the safety, mobility, and capacity specific to each location to provide safer travel for pedestrians.
Alternative Options:
If no action is taken, the safety and mobility benefits associated with the proposed improvements will not be achieved, thereby depriving residents and pedestrians of the enhancements these improvements are intended to provide.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G1: Expand pedestrian and cyclist infrastructure on County-managed roads,
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
08/06/2024 |
86 (24-4540) |
Authorization to Negotiate |
Location: Various Locations within HC MUD 102 - W Little York Rd, Addicks Satsuma Rd, Huffmeister Rd, and Hamstead Park Dr
Address (if applicable): N/A
Precinct(s): Precinct 4
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Bonds - 3109 Road Bond |
$ |
$981,005.00 |
$981,005.00 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$981,005.00 |
$981,005.00 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$981,005.00 |
$981,005.00 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 4/10/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director, Capital Project Infrastructure, Office of the County Engineer
Attachments (if applicable): Professional Engineering Services Agreement