Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): M500-10-00-E002
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC
MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with Agha Engineering, LLC, in the amount of $201,357, to provide additional design, bidding, and construction phase engineering services in support of construction of the Boudreaux Stormwater Detention Basin (Willow Creek Watershed, Bond ID F-106, Project ID M500-10-00-E002, Agreement No. 2024-21, Precinct 3, CDBG-MIT, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 100%).
end
Background and Discussion:
This amendment will allow continued design engineering and environmental professional services for M500-10-00-E002 Boudreaux Stormwater Detention Basin - Phase I. The Flood Control District will construct the project using funding from the CDBG-MIT grant program. This project includes the design of phase 1 of 3 planned phases of a new stormwater detention basin within the Willow Creek watershed. This amendment adds necessary funds for the completion of the Bid Ready design task. Additional design effort was required to redesign from a wet to dry-bottom pond after the 50% submittal. This was due to FAA regulations.
Expected Impact:
The project seeks to reduce flood risks and strengthen resiliency in the Willow Creek watershed by providing a stormwater detention basin to lower the flood elevations along Willow Creek.
Alternative Options:
The alternative to approving this item would be do nothing, which would result in inadequate funding to complete the design of the project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
5/11/2021 |
102 . |
ATN |
|
8/24/2021 |
112. |
Agreement - PER |
|
1/09/2024 |
234. |
Transmittal of PER |
|
4/23/2024 |
180. |
Agreement |
Location: N/A
Address (if applicable):
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
4.a.3 - Engineering Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Bonds |
$ |
$201,357 |
$201,357 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$201,357 |
$201,357 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$201,357 |
$201,357 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/19/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Agreement