Legislation Details

File #: 26-5747    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 8/31/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval of a change in contract with MB Western Construction Co., in connection with final construction of Battleground Sidewalks, with an addition in the amount of $16,918.48, Job No. 25/0277-1, UPIN 24102MF34A01, Precinct 2, MWBE Contracted Goal: 28.68%.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0277, UPIN 24102MF34A01

Vendor/Entity Legal Name (if applicable): MB Western Construction Co.

 

MWBE Contracted Goal (if applicable): 28.68%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with MB Western Construction Co., in connection with final construction of Battleground Sidewalks, with an addition in the amount of $16,918.48, Job No. 25/0277-1, UPIN 24102MF34A01, Precinct 2, MWBE Contracted Goal: 28.68%.

end

 

Background and Discussion:

The project is in East South Harris, West of Beltway 8.  The project consists of approximately 3820 linear feet of concrete sidewalk along Harris County Flood Control (HCFCD) channel B112-02-22 and city of Deer Park Right-of-Way.

Change order includes the following items:

 

PCO-3: change order request-adding $16,993.55

 

Expected Impact:

This project seeks to enhance walkability safety, promote physical activity along Harris County Flood Control (HCFCD) channel B112-02-22 by providing sidewalks.

 

Alternative Options:

N/A

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/30/2025

176 (25-6852)

Contract Award

07/09/2026

352 (26-4175)

Substantial Completion

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3021

$

$16,918.48

$16,918.48

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$16,918.48

$16,918.48

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$16,918.48

$16,918.48

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B