Legislation Details

File #: 24-7609    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 11/26/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Request for approval to execute a joint participation interlocal agreement with The Energy Corridor District for the design and construction of sidewalks and shared use path at selected sections along Park Row Drive from Highway 6 to North Eldridge Parkway, and Dairy Ashford Road from North Eldridge Parkway to Memorial Drive for the Sidewalk - Energy Corridor and Multimodal Connectivity - 2023, UPIN 24104MF38Q01, Precinct 4.
Attachments: 1. 24-7609-Partnership-UPIN 24104MF38Q01-ECD-P4-12102024

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): UPIN 24104MF38Q01

Vendor/Entity Legal Name (if applicable): The Energy Corridor District

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to execute a joint participation interlocal agreement with The Energy Corridor District for the design and construction of sidewalks and shared use path at selected sections along Park Row Drive from Highway 6 to North Eldridge Parkway, and Dairy Ashford Road from North Eldridge Parkway to Memorial Drive for the Sidewalk - Energy Corridor and Multimodal Connectivity - 2023, UPIN 24104MF38Q01, Precinct 4.

end

 

Background and Discussion:

The sidewalks and shared use path will provide safe, efficient, and non-motorized connectivity of numerous land uses such as offices, business center, school, a local Stadium, and residences along the roadways. In addition, the project will also evaluate selected signalized intersections for safety enhancements, compliance to standards, and improved operations for pedestrian and motorists within the project limits. Overall, the project will provide healthy and safe non-motorized accessibility for short trips to various destinations along the selected roadways.

 

Expected Impact:

Safe, efficient, and uninterrupted connectivity for pedestrians and non-motorized mode of transportation along the roadways within the project limits. Code and standard compliance evaluations for safety enhancement and efficient operation of selected intersections for at grade crossings along the roadways.

 

 

Alternative Options:

The denial of the request will deprive the community of the numerous accessibility and safety benefits associated with the project.

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

X Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Park Row Drive - State Highway 6 to North Eldridge Parkway (1.7 miles), North Dairy Ashford Road - N. Eldridge Parkway Intersection to IH-10 (0.8 miles), Dairy Ashford Road - IH-10 to Memorial Drive (1.0 miles) within Energy Corridor District

Address (if applicable): Various

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$7,200,000.00

$7,200,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$7,200,000.00

$7,200,000.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: December 10, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Debjani Chakravarty, MBA, CFM, PMP - Director- Portfolio Management Office & Contracts/Erwin Burden, PE, CFM, Senior Director of Capital Project Infrastructure, HCED

 

Attachments (if applicable):  Interlocal Agreement