Legislation Details

File #: 24-6659    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/15/2024 In control: Commissioners Court
On agenda: 10/29/2024 Final action: 10/29/2024
Title: Request for approval to execute a Second Amendment to the agreement with Landtech, Inc. dba Landtech Consultants, Inc. to update the Scope of Services, increase compensation and payment by $94,000 to replace lump sum language with hourly billing, increase Time and Performance, amend Delivery of Notices, add Historically Underutilized Business Requirements, and replace Appendix B Maximum Raw Salary Rates in support of the completion of the schematic design and approximately one-half of the final design of the direct connectors between East Sam Houston Tollway and SH 225 (Precinct 2).
Attachments: 1. 24-6659 LANDTECH_-_Second_Amendment_(225_Interchange)

Department: Toll Road Authority

Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Landtech, Inc. dba Landtech Consultants, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Second Amendment to the agreement with Landtech, Inc. dba Landtech Consultants, Inc. to update the Scope of Services, increase compensation and payment by $94,000 to replace lump sum language with hourly billing, increase Time and Performance, amend Delivery of Notices, add Historically Underutilized Business Requirements, and replace Appendix B Maximum Raw Salary Rates in support of the completion of the schematic design and approximately one-half of the final design of the direct connectors between East Sam Houston Tollway and SH 225 (Precinct 2).

end

 

Background and Discussion:

On October 9, 2018, Commissioners Court approved an Agreement with Landtech, Inc. dba Landtech Consultants, Inc. in the amount of $355,000 for surveying services in support of the completion of the schematic design and approximately one-half of the final design of the direct connectors between East Sam Houston Tollway and SH 225. Surveying information allows the design engineers to complete final design. The original contract was based upon the initial schematic of the interchange at SH 225.

 

On January 25, 2022, Commissioners Court approved a First Amendment increasing the payment from $355,000 to $480,000 to complete additional surveying services for the final approved schematic by TxDOT. The First Amendment is being amended to increase payment from $480,000 to $574,000.

 

This agreement will allow additional design services to coordinate the remaining bid packages with the future northbound Ship Channel Bridge and TxDOT activities in the area, as well as construction phase services for construction of the interchange.

 

The December 18, 2018, Commissioners Court authorized negotiations with the Texas Department of Transportation (TxDOT) for the design and construction of two partial interchanges - Tomball Tollway at Grand Parkway and Sam Houston Tollway at State Highway 225. On February 23, 2023, the Texas Transportation Commission authorized the connection of the Sam Houston Tollway at State Highway 225 partial interchange and the development of an agreement between Harris County and TxDOT. On April 25, 2023, Commissioners Court approved an agreement for the design, construction, and maintenance of five of the direct connectors and the design of the remaining three direct connectors at the interchange.

 

Expected Impact:

Funding for this request will come from the Toll Road Authority. Approval of amendment will allow management of construction to move forward.

 

Alternative Options:

No other recommended services for this identified need.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10-09-2018

3.a.4

Court approved Surveying Services Agreement

1-25-2022

163

Court approved First Amendment

 

Location:

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering & Construction Service

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Revenue - TRA

$

$85,000

$85,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$85,000

$85,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$85,000

$85,000

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 29, 2024

 

Anticipated Implementation Date (if different from Court date): Notice to proceed pending approval of Amendment

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

 

Attachments (if applicable): Second Amendment