Title: Request for approval of an agreement with Transcend Engineers & Planners LLC for Professional Engineering Services in the amount of $58,484.50 to provide Traffic Signal Improvements to Clay Road at Ventana Prairie Drive, UPIN 22035MF28601, Precinct 3.
Attachments: 1. 21-4760 Consultant - Transcend Engineers & Planners P3.pdf

Department: County Engineer

 

Department Head/Elected Official: John R. Blount, P.E., County Engineer

 

Regular or Supplemental RCA:

Regular RCA

Supplemental RCA

 

Type of Request: Contract - Award

 

Project ID (if applicable): 22035MF28601

Vendor/Entity Legal Name (if applicable): Transcend Engineers & Planners, LLC

MWDBE Participation (if applicable): N/A

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with Transcend Engineers & Planners LLC for Professional Engineering Services in the amount of $58,484.50 to provide Traffic Signal Improvements to Clay Road at Ventana Prairie Drive, UPIN 22035MF28601, Precinct 3.

end

 

Background and Discussion:

 

 A traffic study was conducted at the intersection of Clay Road at Ventana Prairie Drive and the intersection met the traffic signal warrant, in accordance to the 2011 Texas Manual on Uniform Control Devices (TMUTCD).

 

 

Expected Impact:

 

 The installation of a new traffic signal at the subject location will improve the public safety and operation of the intersection.

 

 

 

Alternative Options:

 

 Intersections are evaluated in accordance with the 2011 Texas Manual on Uniform Control Devices (TMUTCD), which takes into consideration traffic volume, crashes, pedestrian activity, and roadway network. Installation of a traffic signal at intersections that meet the required warrants and will improve the safety and operations of the intersection. One alternative option is to install a multi-way stop, which may decrease the level of service of the intersection and increase congestion and delay. Another option is to not install the traffic signal, which may pose a public safety concern.

 

 

Alignment with Goal(s):

Justice and Safety

Economic Opportunity

Housing

Public Health

Transportation

Flooding

Environment

Governance and Customer Service

 

Prior Court Action (if any):

06/08- Authorization to Negotiate

 

 

Location:

Address (if applicable list below):

 

 

Countywide

Precinct 1

Precinct 2

Precinct 3

Precinct 4

 

Fiscal and Personnel Summary

Service Name

-

FY 21-22

Estimates

 

 

 

FY 22

Next 3 FYs

Incremental Expenditures

Labor Expenditures

-

-

-

Non-Labor Expenditures

$58K-

-

-

Total Incremental Expenditures

$58K-

-

-

Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify)

Existing Budget

Mobility-

$58K

-

-

 

-

-

-

-

 

-

-

-

-

Total Current Budget

$58K-

-

-

Additional Budget Requested

-

-

-

-

 

-

-

-

-

 

-

-

-

-

Total Additional Budget Requested

-

-

-

Total Funding Sources

$58K-

-

-

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Implementation Date: 9/14/2021

 

Emergency/Disaster Recovery Note:

Not an emergency, disaster recovery, or COVID-19 related item

 

Emergency Item

COVID-19 related Item

Disaster Recovery related Item

 

Contact(s) name, title, department:

Brannan Hicks, P.E., Traffic Design and Operations Manager, Engineering

 