Legislation Details

File #: 24-6645    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/15/2024 In control: Commissioners Court
On agenda: 10/29/2024 Final action: 10/29/2024
Title: Request for approval of a contract award on the basis of low bid with Times Construction, Inc. in the amount of $21,575,953 for replacement of the Lynchburg Ferry operations and maintenance building and warehouse construction and that the County Clerk execute any applicable bonds to be received (Precinct 2, MWDBE Contracted Goal: 12.5%).

Department: Toll Road Authority

Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240135

Vendor/Entity Legal Name (if applicable): Times Construction, Inc.

 

MWDBE Contracted Goal (if applicable): 12.5%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a contract award on the basis of low bid with Times Construction, Inc. in the amount of $21,575,953 for replacement of the Lynchburg Ferry operations and maintenance building and warehouse construction and that the County Clerk execute any applicable bonds to be received (Precinct 2, MWDBE Contracted Goal: 12.5%).

end

 

Background and Discussion:

Commissioners Court approved to rescind existing award and re-advertise on June 25, 2024. Texas Department of Transportation (TxDOT) concurred with rescinding and re-advertisement of the project. 

 

On August 26, 2024, four submissions were received and evaluated.  One bidder withdrew their bid.  On the basis of low bid for base bid plus alternates 1 through 5 inclusive, award is recommended to Times Construction, Inc in the amount of $21,575,953.

 

As the project has received grant funds from Federal Highway Administration and TxDOT, the MWDBE has been coordinated with TxDOT. 

 

Expected Impact:

This project will remove the current ferry operations building and construct a new operations and maintenance building with an attached maintenance warehouse for increase efficiency and safety of operations an maintenance.

 

Alternative Options:

No other recommended solutions for this identified need.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/25/2019

I-3-c

Authorization to transfer responsibility for current and future operations, maintenance, and capital improvements of the Washburn Tunnel and Lynchburg Ferry in Precinct 2 to the Toll Road Authority.

6/29/2021

180

Request for Authorization to negotiate an agreement with DIG Engineers for the design architectural plans, and coordination regarding the buildings at the Lynchburg Ferry (Precinct 2)

8/10/2021

174

Request for approval of an Agreement with DIG Engineers for Architectural and Engineering design services and coordination regarding the buildings at the Lynchburg Ferry in an amount not to exceed $300,000 (Precinct 2).

3/8/2022

124

Request that the County Judge execute an Advance Funding Agreement between the Texas Department of Transportation and Harris County for the Harris County Toll Road Authority for the replacement of the Lynchburg Ferry Operations building with a new building and site improvements using Ferry Boat Program and Terminal Facilities Construction funding made available through the Federal Highway Administration and the Texas Department of Transportation for a total Federal Participation Cost of $1,683,640 and State Participation Cost of $3,826 (Precinct 2).

6/28/2022

124

Request for approval of a project scheduled for advertisement for the replacement of the Lynchburg Ferry operations and maintenance building and warehouse (Precinct 2).

6/27/2023

132

Request for approval of a contract award on the basis of low bid to Broaddus Construction, LLC in the amount of $15,165,000.80 for the replacement of the Lynchburg Ferry operations and maintenance building and warehouse subject to applicable bonds to be received (230062) (Precinct 2).

6/25/2024

138

Request for approval to rescind the award to Broaddus Construction, LLC in the amount of 15,165,000.80 approved by Commissioner’s Court on June 27, 2023 for the Lynchburg Ferry operations and maintenance building and warehouse construction

6/25/24

142

Request for approval to advertise for construction bids for the replacement of the Lynchburg Ferry operations and maintenance building and warehouse with revised specifications (240135).

 

Location:

Address (if applicable): 1001 Independence Pkwy N, Baytown, TX 77520

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Lynchburg Ferry Operations and Maintenance

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Revenue - TRA

$

$12,700,328

$12,700,328

$

Grant

$

$1,683,640

$1,683,640

$

Choose an item.

$

$

$

$

Total Current Budget

$

$14,383,968

$14,383,968

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$14,383,968

$14,383,968

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 29, 2024

 

Anticipated Implementation Date (if different from Court date): Pending Commissioners Court approval of award and receipt of applicable bonds.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

 

Attachments (if applicable): N/A