File #: 25-3461    Version: 1 Name:
Type: Public Necessity Status: Passed
File created: 5/27/2025 In control: Commissioners Court
On agenda: 6/12/2025 Final action: 6/12/2025
Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement tract for the public project known as Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, for the purpose of roadway construction, UPIN 20104MF1BH01, Precinct 3.
Attachments: 1. 25-3461-(PublicNecessity)-20104MF1BH01-Birnam Wood Seg 2-P3-6-12-25

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

 

Project ID (if applicable): 20104MF1BH01

Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

 

MWBE Contracted Goal (if applicable): Not applicable

MWBE Current Participation (if applicable): Not applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement tract for the public project known as Birnam Wood Blvd Segment 2 - from south of J109-01-01 to Cypresswood Dr - 2019, for the purpose of roadway construction, UPIN 20104MF1BH01, Precinct 3.

end

 

Background and Discussion:

This capital project is a road expansion upgrade on Birnam Wood Dr from south of J109-01-01 to Cypresswood Dr from 2-lane concrete 1/2 Blvd. section to 4-lane concrete curb and gutter Blvd. with 32' raised median within a 100' ROW. This project includes 5 feet sidewalks and a twin bridge over J109-01-01.

 

Expected Impact:

The project will improve the roadway and drainage conditions within this segment of Birnam Wood Boulevard. With the acquisition of the property needed, Harris County will be able to proceed with construction of this project, resulting on improved road conditions for the community located in this area.

 

Alternative Options: 

If not approved, this project will not be able to proceed with construction, resulting on this location to continue operating under the current conditions for the community located in this area.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 24505 Birnam Wood Drive, Spring, TX 77373

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/12/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Michael Ware, Director, Real Property Division

 

Attachments (if applicable): Findings and Declarations; Metes and Bounds & Survey Map