Legislation Details

File #: 24-2616    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/22/2024 In control: Commissioners Court
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Request for approval of a change in contract with SER Construction Partners, LLC, in connection with Holderrieth Road Drainage Improvements Project, with an addition in the amount of $339,387.55, Job No. 22/0369-12, UPIN 18104MF0R901, Precinct 3, MWDBE Contracted Goal: 27%, MWDBE Current Participation: 46.04%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0369, UPIN 18104MF0R901

Vendor/Entity Legal Name (if applicable): SER Construction Partners, LLC

 

MWDBE Contracted Goal (if applicable): 27%

MWDBE Current Participation (if applicable): 46.04%

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with SER Construction Partners, LLC, in connection with Holderrieth Road Drainage Improvements Project, with an addition in the amount of $339,387.55, Job No. 22/0369-12, UPIN 18104MF0R901, Precinct 3, MWDBE Contracted Goal: 27%, MWDBE Current Participation: 46.04%.

end

 

Background and Discussion:

Project includes the reconstruction of Holderrieth Rd from SH 249 to 850' west of Hufsmith-Kohrville Rd.  Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32' raised median.

 

Change includes the relocation of service line, water line and gas line. All these relocations was essential to install roadway and roadway infrastructure (sidewalk) per plans.

 

New item

Item 289                     3 Phase Electrical Riser Relocation                                                               1 LS                                          $11,180.91                     $11,180.91

Item 290                     Sanitary Sewer Service Lines                                                                                    186 LF                                          $288.54                     $53,668.44

Existing Items

Item 126                     12-inch diameter PVC water line (all depth)                                          1733 LF                     $112.10                     $194,269.30

Item 128                     12-inch Gate Valve & Box                                                                                    1 EA                                          $3,390.50                     $3,390.50

Item 129                     cut, plug, and abandon existing 12-inch waterline    1 EA                                          $2,117.70                     $2,117.70

Item 130                     12-inch Wet Connection                                                                                    1 EA                                          $2,432.20                     $2,432.20

Item 131                     Fire Hydrant assembly, 6-In gate valve and box                     1 EA                                          $7,653.00                     $7,653.00

Item 134                     6-inch diameter gas line (all depth)                                                               1625 LF                     $53.80                                          $87,425.00

 

                     

Change also includes the reduction of installation 12-IN PVC waterline by open cut method.  The reduction will be offset by a decrease in the quantity of 12-IN waterline by open cut method:

Item 129                     cut, plug, and abandon existing 12-inch dia water line                     5 EA                     $2,117.7                     ($10,588.50)

Item 130                     12-inch Wet Connection                                                                                                         5 EA                     $2,432.2                     ($12,161.00)

 

Expected Impact:

This change allows the contractor to be appropriately compensated for the work performed while mitigating the additional cost as much as possible.

 

 

Alternative Options:

An alternative option for the cost offset was to not relocate the waterline but it would remain under the roadway, and it would create maintenance issues in long run.

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/10/2023

326

Contract Award

06/27/2023

32

Contract Amendment for additional funds and extensions of project term

08/29/2023

59

Contract Amendment for additional funds

08/08/2023

40

Contract Amendment for additional funds and extensions of project term

08/08/2023

54

Contract Amendment for additional funds

08/08/2023

42

Contract Amendment for additional funds

08/29/2023

40

Contract Amendment for additional funds

08/29/2023

42

Contract Amendment for additional funds

10/10/2023

51

Contract Amendment for additional funds

12/05/2023

47

Contract Amendment for additional funds

03/26/2024

74

Contract Amendment for additional funds

 

Location: Holderrieth Road

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 2601, 2699

$

$339,387.55

$339,387.55

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$339,387.55

$339,387.55

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$339,387.55

$339,387.55

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: May 07, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B