Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 20401 1/2 Clay Road, Katy, TX 77449 for electrical power serving a traffic signal at the intersection of Clay Road at Westfield Village Drive, UPIN 24035MF37M01, Precinct 4.
Attachments: 1. 25-6295-SOLS-24035MF37M01-Clay and Westfield Village Dr-CenterPoint Energy-P4-10-16-2025

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): UPIN - 24035MF37M01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 20401 ½ Clay Road, Katy, TX 77449 for electrical power serving a traffic signal at the intersection of Clay Road at Westfield Village Drive, UPIN 24035MF37M01, Precinct 4.  

end

 

Background and Discussion:

Re-building the traffic signal at the intersection of Clay Road at Westfield Village Drive is a project that aims to improve the operation of the intersection and better facilitate pedestrian activities. The service outlet location statement is needed to establish electrical service from CenterPoint Energy Houston Electric, LLC to power the traffic signal.

 

Expected Impact:

Approval of the service outlet location statement will allow CenterPoint Energy Houston Electric, LLC to provide electrical service to the traffic signal, which is needed to enhance operations at the intersection of Clay Road at Westfield Village Drive.

 

 

 

Alternative Options:

All traffic signals require a power source, which is typically obtained through CenterPoint Energy Houston Electric, LLC.  Alternative options are to place a generator, which is not reliable, or to not re-build the traffic signal at the intersection. Both options will negatively impact operations and increase delay of the intersection.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/19/2023

99

Request for approval to negotiate with Lockwood, Andrews & Newnam, Inc. (LAN) to provide professional engineering services for the design, survey, and rebuild traffic signal with pedestrian-related appurtenances at Clay Road and Westfield Village Drive, Precinct 4.

05/07/2024

41

Request for approval to execute an agreement with Lockwood, Andrews & Newnam, Inc. (LAN) in the amount of $106,581.20 for Professional Engineering Services to rebuild a traffic signal at the intersection of Clay Road and Westfield Village Drive, UPIN 24035MF37M01, Precinct 4, MWDBE Contracted Goal: 19.6%.

 

Location: Clay Road at Westfield Village Drive

Address (if applicable): 20401 ½ Clay Road, Katy, TX 77449

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Traffic Engineering and Operations

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 1070-10443003-619040-PCT04-RB-OPS-1070

$

$0

$0

$1200

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$0

$0

$1200

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$0

$0

$1200

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/18/2025

Anticipated Implementation Date (if different from Court date): n/a

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief, Engineering & Architectural Services, OCE

 

Attachments (if applicable): SOLS