Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Grant - Amendment
Project ID (if applicable): P500-06-00-E006, E500-25-00-E001, B512-02-00-E001
Vendor/Entity Legal Name (if applicable): U.S. Department of Agriculture/Natural Resources Conservation Service
MWBE Contracted Goal (if applicable):
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): 0%
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to accept an amendment to an agreement with the U.S. Department of Agriculture/Natural Resources Conservation Service to extend the grant end date to March 31, 2027, for the Emergency Watershed Protection Pilot Program (Greens Bayou Watershed, Bond ID C-34, Project IDs P500-06-00-E006, E500-25-00-E001, and B512-02-00-E001, Precincts 1 and 2).
end
Background and Discussion:
It is recommended that the Harris County Flood Control District be authorized to accept an amendment to the United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) Grant Award for three projects under the Emergency Watershed Protection (EWP) Pilot Program. This grant award amendment will continue to provide financial and technical assistance to the Flood Control District for floodplain restoration under a pilot program in Harris County.
The grant is being used for the construction of three stormwater detention basins and minor tributary conveyance improvements within the Armand Bayou, Greens Bayou, and the White Oak Bayou watersheds to provide flood damage reduction to the surrounding communities and meet NRCS goals of restoring previously developed areas to the floodplain. The award consists of $28,000,000 of federal funds with no required cash match from the Flood Control District. The amendment extends the period of performance by 181 days with no change in funding.
Expected Impact:
The Brookglen Area Flood Risk Reduction Project (Completed), B512-02-00-E001, will restore 40 acres along Armand Bayou tributary to restore natural hydraulic connectivity, with mitigating storage volume to reduce flood risk in the Brookglen subdivision and surrounding areas in southeast Harris County. The restoration of these 40 acres will produce approximately 140 acre-feet of additional floodplain storage.
Arbor Oaks Stormwater Detention Basin, E500-25-00-E001, will restore 70 acres of former subdivision to a properly functioning floodplain. This restoration will produce approximately 700 acre-feet of additional floodplain storage as well as provide flood risk reduction to approximately 1,800 structures.
Lauder Stormwater Detention Basin (Phase II) (Completed), P500-06-00-E006, will restore a 115-acre former subdivision along Greens Bayou in northeast Harris County. This restoration will produce approximately 900 acre-feet of additional floodplain storage and reduce the risk of more frequent structural flooding between Beltway 8 and US 59 in Harris County.
Alternative Options:
The alternatives are: 1) not to accept the grant amendment, wherein awarded unused grant funding would be returned to NRCS at the end of the existing period of performance on October 1, 2026, and projects lose funding, or 2) the projects’ engineering and construction will need to be funded entirely with local funding.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
10/16/2025 |
267. |
Grant Amendment |
Location: N/A
Address (if applicable):
Precinct(s): Precincts 1 & 2
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 10/29/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Order and No Cost Extension