Title: Request for approval of a change in contract with Hayden Paving, Inc., in connection with final construction of BS2N Hardy/Aldine - 2024, with a deduction in the amount of $541,059.22, Job No. 25/0017-2, UPIN 24102MF3B401, Precinct 2, MWBE Contracted Goal: 21.66%, MWBE Current Participation: 95.05%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0017, UPIN 24102MF3B401

Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.

 

MWBE Contracted Goal (if applicable): 21.66%

MWBE Current Participation (if applicable): 95.05%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hayden Paving, Inc., in connection with final construction of BS2N Hardy/Aldine - 2024, with a deduction in the amount of $541,059.22, Job No. 25/0017-2, UPIN 24102MF3B401, Precinct 2, MWBE Contracted Goal: 21.66%, MWBE Current Participation: 95.05%.

end

 

Background and Discussion:

The project consists of rehabilitating various asphalt and concrete roadways located within the Hardy/Aldine area of Harris County Precinct 2.  The work includes milling and overlaying existing asphalt pavement, performing required base repairs, and applying prime coat, tack coat, and dense-graded surface overlays across the full roadway width.  The project also includes full-depth concrete pavement repairs, restoration of a smooth riding surface, and installation of new pavement striping.

 

This final change order is for a deduction of the final adjustment in the amount of $541,059.22 and includes quantity adjustments of existing items for final values.

 

Final Adjustment is the reconciliation of actual quantities used in construction against the bid quantities.

 

The final change in contract includes the following: 

  PCO#2                                          Final Adjustment:                                          ($541,059.22)                                          Time: Zero Days

 

Expected Impact:

The final change adds zero days to the contract and allows the contractor to be paid the final estimates, including retainage, while returning the unused funds to the precinct.

 

Alternative Options:

No alternative options: If no action is taken, the project will not be closed out, and the contractor will be delayed for payment of their final pay estimates which include the retainage.  

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

Additional notes related to the Strategic Plan: N/A

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/10/2025

156 (25-2258)

Contract Award

07/09/2026

18 (26-4153)

Contract Amendment for additional funds

07/09/2026

350 (26-4173)

Substantial Completion

 

Location:

Address (if applicable): Hardy/Aldine Area

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002, 3109

$

-$541,059.22

-$541,059.22

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$541,059.22

-$541,059.22

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$541,059.22

-$541,059.22

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/25/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B