File #: 26-6796    Version: 1 Name:
Type: Reports Status: Agenda Ready
File created: 10/1/2026 In control: Commissioners Court
On agenda: 10/15/2026 Final action:
Title: Request for approval of a Study Report prepared by Midtown Engineers, LLC, for Porter Rd - Clay Rd to Stockdick School Rd - 2023, UPIN 24104MF3A301, Precinct 4.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): UPIN: 24104MF3A301

Vendor/Entity Legal Name (if applicable): Midtown Engineers, LLC

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): 45.82 %

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a Study Report prepared by Midtown Engineers, LLC, for Porter Rd - Clay Rd to Stockdick School Rd - 2023, UPIN 24104MF3A301, Precinct 4.

end

 

Background and Discussion:

Porter Road is an existing 2-lane asphalt road with roadside ditches. The project proposes improving the existing conditions to a 4-lane concrete boulevard with medians, underground storm sewer and sidewalks.

 

Expected Impact:

The project will upgrade and expand the capacity of the 2-lane roadway to 4-lanes to handle the demands of the current and future traffic volumes. The improvements will alleviate congestion, reduce delays, and provide safe mobility for residents, pedestrians, and drivers in Northwest Katy.

 

Alternative Options:

If the County could not elect to approve this request, the consultant would not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

 

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

1/30/2024

24-0683

Authorization to Negotiate for Professional Engineering Services

12/10/2024

25-1570

Contract Award for Professional Engineering Services

 

 

 

 

Location: Katy

Address (if applicable): Porter Rd - Clay Rd to Stockdick School Rd, Katy, TX 77493

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109 Road Bond

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/15/2026

Anticipated Implementation Date (if different from Court date): N/A Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services

Harris County Office of the County Engineer

 

Attachments (if applicable): Study Report