File #: 24-5673    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/5/2024 In control: Commissioners Court
On agenda: 9/19/2024 Final action: 9/19/2024
Title: Request for approval of a change in contract with Mar-Con Services, LLC, in connection with final construction of Emerald Forest Subdivisions Road and Drainage Improvements (Cypress Place-Ph II), with a deduction in the amount of $40,069.33, Job No. 22/0444-1, Bond Fund, UPIN 21289MF21501, Precinct 3, MWDBE Contracted Goal: 26%, MWDBE Current Participation: 100%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 21289MF21501 - Job. No.: 22/0444

Vendor/Entity Legal Name (if applicable): Mar-Con Services, LLC

 

MWDBE Contracted Goal (if applicable): 26%

MWDBE Current Participation (if applicable): 100%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Mar-Con Services, LLC, in connection with final construction of Emerald Forest Subdivisions Road and Drainage Improvements (Cypress Place-Ph II), with a deduction in the amount of $40,069.33, Job No. 22/0444-1, Bond Fund, UPIN 21289MF21501, Precinct 3, MWDBE Contracted Goal: 26%, MWDBE Current Participation: 100%.

end

 

Background and Discussion:

The Emerald Forest Subdivisions Road and Drainage Improvements (Cypress Place-Ph II) project includes drainage improvements consisting of an underground storm sewer box system along the bottom half of Cypress Place Drive while regrading all roadside ditches. The underground storm sewer box system will connect to the newly installed 13 feet x 10 feet junction box part of Phase I construction. All sheet flow will either outfall to the newly improved drainage system that outfalls to Harris County Flood Control District Channel E132-02-00 or existing Cypress N. Houston storm sewer system. Paving work will also include the removal and replacement of concrete residential driveways along with new culverts. The proposed roadside ditches will be improved to account for a future 22-foot roadway widening along with the enlargement of all 4 cul-de-sacs.

 

The Change in contract request includes the following:

 

                     Final Adjustments: The deduction of $40,069.33 for reconciliation of actual quantities used in construction with estimated quantities used for completing the proposed scope of work.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Emerald Forest (Cypress Place-Ph II) subdivision.

 

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the unutilized grant funds will not be used to compensate the contractor for completing the scope of the work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/21/2023

23-0902

Contract Award - Mar-Con Services, LLC

04/23/2024

24-2182

Contract Amendment - 22/0444-1 - Grant

08/06/2024

24-4550

Substantial Completion

 

Location: Emerald Forest Subdivisions Road and Drainage Improvements (Cypress Place-Phase II)

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

-$40,069.33

-$40,069.33

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

-$40,069.33

-$40,069.33

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

-$40,069.33

-$40,069.33

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: September 19, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Change in Contract (CIC)