Legislation Details

File #: 24-5070    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/13/2024 In control: Commissioners Court
On agenda: 8/27/2024 Final action: 8/27/2024
Title: Request for approval of a change in contract with Blazey Construction Services, LLC, in connection with Evergreen Villas Subdivision Drainage Improvements, with an addition in the amount of $29,040.57, Job No. 23/0138-3, UPIN 19101MF14M01, Precinct 1, MWDBE Contracted Goal: 27%, MWDBE Current Participation: 100%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0138 - UPIN 19101MF14M01

Vendor/Entity Legal Name (if applicable): Blazey Construction Services LLC

 

MWDBE Contracted Goal (if applicable): 27%

MWDBE Current Participation (if applicable): 100%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Blazey Construction Services, LLC, in connection with Evergreen Villas Subdivision Drainage Improvements, with an addition in the amount of $29,040.57, Job No. 23/0138-3, UPIN 19101MF14M01, Precinct 1, MWDBE Contracted Goal: 27%, MWDBE Current Participation: 100%.

end

 

Background and Discussion:

Evergreen Villas is in Northeast Harris County, Texas, Precinct 1. The subdivision is mainly composed of single-family homes. The residents have experienced structural flooding during several recent flood events. Approximately 37 homes were reported to have flooded during Hurricane Harvey. The purpose of this project

is to reduce flooding for homes. The proposed solution includes upgrading storm sewers and adding a

detention pond. This contract includes construction services for the construction phase.

 

The Change in contract request includes new items for the following:

•                     Reimbursement for Payment to CenterPoint Street Lights - Added a new Line item “Reimbursement for Payment to CenterPoint Street Lights” with an additional cost of $986.00. Reimbursement for the contractor's payment to CNPE SL for the relocation of cables in conflict with a proposed manhole.

•                     Repair of Existing 6x3 Outfall - Added a new Line item “Repair of Existing 6x3 Outfall” with an additional cost of $26,854.57. Stormwater erosion prevents the contractor from grading the slopes in this area of the detention pond by not allowing any in-situ material to remain in place.

•                     Remove and Replace Cedar Fencing - Added a new Line item “Remove and Replace Cedar Fencing” with an additional cost of $1,200.00. A section of an existing cedar fence sitting on the ROW needed to be removed and replaced since the proposed junction box required an excavation trench up to the ROW to fit in with the proper bedding and backfill material.

 

 

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Evergreen Villas Subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the original scope of work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/06/2023

23-3343

Contract Award - Blazey Construction Services, LLC

10/31/2023

23-6252

Contract Amendment (23/0138-1) for additional funds

04/23/2024

24-2240

Contract Amendment (23/0138-2) for additional funds

 

Location: Evergreen Villas Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$29,040.57

$29,040.57

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$29,040.57

$29,040.57

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$29,040.57

$29,040.57

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: August 27, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Change in Contract (CIC)