Legislation Details

File #: 26-5494    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/12/2026 In control: Commissioners Court
On agenda: 8/25/2026 Final action: 8/25/2026
Title: Request for approval of an amendment to an agreement with HR Green, Inc. in the amount of $52,068.00 to perform design phase services in connection with the Hufsmith-Kohrville Road Segment 3A project, from approximately 700 feet north of Ezekiel Road to approximately 400 feet north of Boudreaux Road, UPIN 15104M23NP03, Precinct 3.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 15104M23NP03

Vendor/Entity Legal Name (if applicable): HR Green, Inc.

 

MWBE Contracted Goal (if applicable): 0%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with HR Green, Inc. in the amount of $52,068.00 to perform design phase services in connection with the Hufsmith-Kohrville Road Segment 3A project, from approximately 700 feet north of Ezekiel Road to approximately 400 feet north of Boudreaux Road, UPIN 15104M23NP03, Precinct 3.

end

 

Background and Discussion:

Adkisson Group is developing a site consisting of four (4) warehouse buildings located on Hufsmith-Kohrville Road, across from Kohrville Elementary School at Woodland Shore Drive.  The intersection and storm sewer tie ins to the Hufsmith-Kohrville Road Segment 3A are being incorporated into the Harris County capital project to provide a completed intersection at the time of construction complete. To accommodate a proposed development, as part of the roadway project, requiring installation of a fourth leg traffic signal at Woodland Shore Drive,  an eastbound left-turn lane at Woodland Shore Drive, three (3) concrete driveways, two (2) storm sewer manholes and storm pipe, installation of a pedestrian signal pole, ADA-compliant curb ramps, pavement markings and other associated roadway improvements. 

 

Expected Impact:

The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of the area.

 

Alternative Options:

If no action is taken, the prime consultant will not be able to proceed with the design, and this site will not follow improvements along Hufsmith  Kohrville Road 3A or be accessible.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/10/2015

1.a.2.b.6

Professional Engineering Services agreement approved on court agenda

09/27/2016

1.a.2.c.4

First amendment to Professional Engineering Services agreement approved on court agenda

05/25/2021

52

Second amendment to Professional Engineering Services agreement approved on court agenda

09/14/2021

58

Third amendment to Professional Engineering Services agreement approved on court agenda

01/25/2022

61

Fourth amendment to Professional Engineering Services agreement approved on court agenda

12/13/2022

47

Fifth amendment to Professional Engineering Services agreement approved on court agenda

03/14/2023

28

Sixth amendment to Professional Engineering Services agreement approved on court agenda

02/27/2024

54

Seventh amendment to Professional Engineering Services agreement approved on court agenda.

3/26/2024

59

Eighth amendment to Professional Engineering Services agreement approved on court agenda

1/8/2026

57

Request for approval to execute an agreement with HR Green, Inc., in the amount of $184,954.00 for Construction Phase Services in connection with Hufsmith-Kohrville Road Segment 3A project, UPIN 15104M23NP03, Precinct 3.

2/26/2026

40

Ninth amendment to Professional Engineering Services agreement approved on court agenda

 

Location: Tomball, Texas 77375

Address (if applicable):

Precinct(s): Precinct 3

 

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$52,068.00

$52,068.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$52,068.00

$52,068.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$52,068.00

$52,068.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/25/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer.

 

Attachments (if applicable): Contract and Exhibits.