Legislation Details

File #: 26-0868    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/27/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of a change in contract with Hayden Paving, Inc., in connection with Asphalt Package 2024 - 2, adding 14 calendar days, with an addition in the amount of $242,193.50, Job No. 24/0226-2, UPIN 24208MF36H01, Precinct 3, MWBE Contracted Goal: 32.56%, MWBE Current Participation: 66.27%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0226, UPIN 24208MF36H01

Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.

 

MWBE Contracted Goal (if applicable): 32.56%

MWBE Current Participation (if applicable): 66.27%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hayden Paving, Inc., in connection with Asphalt Package 2024 - 2, adding 14 calendar days, with an addition in the amount of $242,193.50, Job No. 24/0226-2, UPIN 24208MF36H01, Precinct 3, MWBE Contracted Goal: 32.56%, MWBE Current Participation: 66.27%.

end

 

Background and Discussion:

The scope of work consists of, but not limited to, the following tasks for reconstruction of approximately 3.18 miles of roads - Van Road 0.85 mile, Ramsey Road (2.3 miles), a portion of shields street within Missouri Pacific Railroad Right-of-Way (160 LF), and the rehabilitation of Plum Grove Road 2.25 within Harris County Precinct 3 area.

 

This change in contract includes:

PCO#02 (RFI#14): Extension of Shields Road limits by 1,300 LF, including removal of existing roadway, new 8" pavement, updated striping and signage, and all miscellaneous items required to deliver a complete roadway per HC standards. Cost Impact: $242,193.50

 

Expected Impact:
Provides a more durable roadway and cost efficiencies by completing the work while crews are already mobilized. Schedule impact is an additional 14 calendar days.

 

Alternative Options:

None at this time.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/12/2024

247 (24-7181)

Contract Award

09/18/2025

32 (25-5620)

Contract Amendment #1 for additional funds

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$242,193.50

$242,193.50

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$242,193.50

$242,193.50

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$242,193.50

$242,193.50

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/12/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B